Reports
- Municipal session on the 8th, in Laurel
- Municipal meeting of August 11th, 2014
- Municipal session of June 9th, 2014
- Council of the MRC's session of April 8, 2014
- Municipal session of May 12th, 2014
- Municipal session of April 14th 2014
- March 11th, 2014 MRC Board's session
- Municipal session of March 10th
- Minutes of 2013 ALSFX Annual General Meeting
- Report on the Municipal Council meeting in Montfort
- Report on the Municipal Council meeting of September 9, 2013
- Report on the Municipal Council meeting
- 600 rainbow trout at the lake!
- Photos of trout restoking
- Report on the Municipal Council meeting of June 10th, 2013
- Success of the presentation of the feasibility study
- Report on the Municipal Council meeting of April 8th, 2013
- Minutes of 2012 ALSFX Annual General Meeting
- Report on the municipal Council session of January 14th, 2013 in Montfort
- Report on session of the municipal Council of Oct. 9th 2012
- Meeting of the Lake Associations
- Report on the Municipal Council meeting of June 11th, 2012
- Aerobic Corridor, Ecological trail and Access roads
- Report on the Municipal Council meeting of May 14th, 2012
- Report on the Municipal Council meeting of April 10th, 2012
- Chemin de Montfort, short summary of meeting held on Feb 22
- Official minutes of the municipal council sessions
- Report on the Municipal Council meeting of January 9th, 2012
- Report on the Municipal Council meeting of December, 12th 2011
- Report on municipal council session of Oct. 11th, 2011, in Montfort
- Minutes of 2011 ALSFX Annual General Meeting
|  Municipal session on the 8th, in Laurel | Report on Municipal session of Sept. 8th, 2014, R. Noël Dave and I attended the municipal council meeting in Laurel this evening. All of the official agenda was dry and virtually none of it applied to our lake. The only relevant item was that the municipality has awarded a contract for the supply of civic numbers for all addresses. These are to be in a standard format in reflective paint and installed in specific locations so that first responders can clearly see the numbers regardless of which direction they are coming from. Municipal staff will do the installations.
During question period we asked three questions: • what is the status of the project to control access on the aerobic corridor? o they have received one bid for the barriers but their rules require three if the value is over $25,000. They are now looking for two more bids o this work will only proceed once the Department of Transport fixes the Newaygo bridge o the bridge repairs were supposed to be done last January, which was delayed until June or July and it still hasn't started. The mayor has been pursuing the Ministry without much success. o he does not see this work being completed this year. (But, on this Monday, September 15, Transport Québec employees busied themselves to repair the bridge. According to the foreman, they have for two days. Two transverse steel beams will be placed under the bridge to make it accessible again to traffic.) • what is the status of the work on the problem of sand on the hill at Montfort washing into the lake and where are the environmental studies to determine the best course of action? o again that work was supposed to be done this year but it is now too late. o the Ministry of Transport is responsible for this and the Mayor has been after them without much success o the work will consist of trapping the sand that comes down the hill and removing the accumulation in the lake by the bridge o by inference, there will be nothing done to prevent salt and other snow-clearing chemicals from entering the lake (an inference since the Mayor refused to talk about it) o the Mayor now expects that the work will be done next July or August. • what is the status of the parking for the beach? o nothing will be done until the barriers are put in place, which depends in turn upon the repairs to the Newaygo bridge o there is no change in the plan to have the parking as close to the beach as possible | | up | |
|  Municipal meeting of August 11th, 2014 | Held in St. Michel-de-Wentworth
A few points to the agenda particularly got our attention. 1. Authorization was moved to have a call for tenders for a study of characterization of the land on which should go the future road for the sector, said Thurson, on Lake St. François-Xavier. At the question period, the Mayor will confirm us that the road project, adopted this spring, is thus going forward. 2. Under item Public safety, the Mayor reported having received the congratulations of our Association on the presence of the security officers at our Pot Luck of July 12th and on the demonstration made with the amphibious all-terrain vehicle. 3. The period of renewal of some members of the Planning Advisory Committee is open. Those who would be interested in taking part are invited to submit their candidacy. 4. There will be a sing at Laurel announcing the Shuttle of Lake of Sixteen Islands. | | up | |
|  Municipal session of June 9th, 2014 | Report on the session of the Municipal Council of June 9, 2014 (held in Laurel)
Reports of the Mayor and Councilors Mr. Genest:
- The Churches go round Day was a unique event and one of the most interesting. Thanks to those who participated in its success.
- The MRC, pending the results of studies, still holds an interim moratorium on construction of superstores. A maximum of 7,000 square meters is currently allowed for Ste. Adèle and St. Sauveur; it is 4,000 square meters for other municipalities of the MRC.
- Meeting with the Ministry of Transport on the problem of sand accumulation in the channel at the foot of rue Principale, in Montfort. The work will be done this fall; the sand should be almost totally retained.
- Following discussions with residents, we are looking at the capacity of the future small parking for de Montfort municipal beach, at the entrance of de shared way of the Aerobic Corridor.
- We are also evaluating the cost of the activated barrier to be installed at the end of the Newaygo Road, which part of cost shall be charged to the concerned residents.
- We went to Chelsea, accompanied by Councilors Soucy and Théorêt, to appreciate their experience with a training center for the biathlon, as foreseen for W - N. Many are interested in our project, including Loisirs Laurentides. We must aim at accessibility.
Councilor Théorêt: Concerning the St. Jean holiday, there will be food services on-site, in Laurel, games, etc. It will start at 11am, June 24, and might end up at 11pm.
Administration
- Thurson Road: Presentation of the registry signed on 16 may in Montfort, in connection with the borrowing by-law. The number of signatures necessary for the holding of a referendum was not reached and the adopted by-law is thus formalized. (Notice of formalization is displayed at Montfort’s Pavilion.)
Public safety
- The installation of a special panel at the entrance of rue du Chemin-de-fer, at Montfort, is authorized to prevent emergency services that the road is temporarily cut off to motorized traffic, at the Newaygo Bridge.
Leisure and culture
- Laurel Ma Muse: A grant, of a maximum of $150 per event, will be given to the organism by the municipality (and the MRC?) https://sites.google.com/site/laurelmamuse/.
- $15,000 are planned to complete the trail (non-motorized) linking Laurel to Montfort. Authorization from de the Ministry des Forêts, de la Faune et des Parcs is required for going through the forest under its jurisdiction.
Question period
- C. Chapdelaine: Where will be located the parking for the Orphans’ Trail and how would you access? Answer from Mayor: A parking, of a dozen places perhaps, would be located as close as possible to the trail, on municipal land. It would be accessible from projected Thurson road.
Note: Submitted as simple information to our members, pending the release of the minutes by the Municipality. C. Chapdelaine | | Minutes 2014 | |
|  Council of the MRC's session of April 8, 2014 | June, 7th, 2014
4. CENTRE LOCAL DE DÉVELOPPEMENT DES PAYS-D’EN-HAUT (CLD)
- ' Signing of an agreement between the Coopérative de solidarité des 4 pôles and the MRC des Pays-d'en-Haut... for the organization, operation and administration of a river shuttle on the Sixteen Islands Lake, ...following the recommendation of a $100,000 grant obtained through the Fonds de diversification. '
- 'Mr. André Genest, Mayor of Wentworth-Nord, asked Mr. Stéphane Lalande, Director of the CLD, on the following points:
- "High speed Internet. In this regard, Mr. Lalande indicates that the agreement is signed between the provider and the Ministry of Municipal Affairs, Regions and Land occupancy. The information will be given to the public attention by way of a press release in the next few days." L’information du Nord (French)
- "Rural officer position. Concerning the request for support addressed by its municipality on some current issues. In response to such request, Mr. Stéphane Lalande tells that if necessary, the CLD staff can be put to work when required, all to the extent of availability at the CLD."
7. PARC REGIONAL DES PAYS-D'EN-HAUT 3) Inventory of bridges and culverts of the Linear park and the Aerobic corridor: Me Genest mentions this inventory provided by the MTQ, regional branch, which has circulated on the Linear park and the Aerobic corridor to evaluate the bridges and culverts. This document will serve during the renegotiation of the lease of the Linear Park with the Ministry of transport. (E) Public lands division: 1. Awarding of a contract for the maintenance on the vegetation of La Montfortaine: ' It is moved by Councillor André Genest... and decided unanimously by the Councillors present: That the MRC’s Council...agrees to the proposal made by the company Enviroforet, for the sum of $ 10,710, to proceed to maintenance on vegetation to ensure the safety of users (walkers) of La Montfortaine’s hiking circuit, located in public land under CAAF, in the municipality of Wentworth-Nord (Montfort sector). … Adopted" 8. PREFECT CHARLES GARNIER’S RECORDS B) Solidarité rurale du Québec: "M. Charles Garnier mentions the renewal of the mandate of Mr. André Genest as Vice President of Solidarité rurale du Québec. Mr. Garnier underlines the national involvement of Mr. Genest which reflects on our regional community." 14. MISCELLANOUS A) Transportation Plan: "Following the presentation of the report of the firm GESTRANS relating to the proposal to establish a regional collective transportation plan based on the recovery of a portion of the tax on gasoline for the five (5) MRC concerned , it is agreed to use the existing MRC des Pays-d'en-Haut’ s Committee on transport... to investigate more fully such question." 15 QUESTION PERIOD "Following a question asked by a citizen of Wentworth-Nord on the load capacity of some bridges, it is asked to the Director General to investigate the current situation in municipalities so as to submit a report at the next meeting." Extracts and translation from the Minutes, by Carl Chapdelaine | | up | |
|  Municipal session of May 12th, 2014 | Partial report of the meeting of the Municipal Council of May 12, 2014 (held in Saint-Michel de Wentworth)
4. Reports of the Mayor and Councillors Councillor Alary:
- The provincial health authorities should accept to reimburse the residents of the St. Michel sector so they can seek medical treatment at the closest, i.e. at Lachute, in the MRC of Argenteuil.
Mayor Genest:
- Aerobic Corridor: A new meeting was held with the Ministry of Transport for the future use of the shared way of rue du Chemin-de-fer/Aerobic Corridor. (See 5.9)
o The Ministry accepts that section as a shared way. o Bridge at Newaygo should be rebuilt and reopened to traffic at the beginning of summer. o Barriers will however limit the use of said section only to residents of rue du Chemin-de-fer and to those without a road who must have access to the two docks or boat ramp. o The owners at the beginning of Mount Street and Docmanov will have no other choice than to use the future Lake Thurson road, if the proposed by-law of borrowing for its construction goes ahead... o Small parking and a fixed barrier will be installed on the Corridor, at Montfort, before access to the beach (house of Mrs. Saint-Laurent). Another fixed barrier will also block this section at km 9.9. No House is located in between. These barriers can be lifted, if necessary, by the municipal employees. o A mechanical barrier will be installed at the end of the paved road of Newaygo and will control all access from there to both sections of rue du Chemin-de-fer. Residents of that street will be given key cards and individual codes for remote activation of the gate. Lake residents will also be given similar access to permit them to use the docks, as will be public services providers. Each use will be recorded for control purposes. A sensor nested under the paving will allow any vehicle to exit without the need of any key card or code. Telephonic communication will serve as intercom. Access to the parking lot of the marina will not be affected. o Residents authorized to use the road will have to pay a portion of the bill. o A camera will be installed around the mechanical barrier and ideally will watch over the traffic, as well as the use of waste bins in the parking and in the shed or will turn its eye towards the boat launching ramp.
- Bench in memory of Tony Chiesa: Mayor praises the initiative coming to fruition at the Aerobic Corridor, in the presence of the widow and the entourage of the deceased, as well as representatives of our Association. He recalls that the couple loved fishing near this place situated upstream of waterfalls at the Deer Lake’s outlet.
5. Administration
Preamble:
- Sand in the channel: A delegation of the Municipality met Ms. Laroche, Regional Director of the Department of Transport, as well as a representative of the new Ministry of sustainable development, the environment and the fight against climate change, about the accumulation of sand in the channel that passes under the bridge of Montfort and which is due to the presence of the big hill of rue Principale. A system to retain the sand and gravel will be installed shortly. The dredging of the channel is also planned.
- The village of St. Michel is theoretically landlocked between two bridges not complying with regulation on heavy traffic; the issue must be addressed.
5.3 Hiring of students and temporary staff: more than a half dozen people are hired for the season.
5.8 Registry on borrowing for the Thurson road project: A request was made by several affected residents of the Thurson sector of Lac St. Francois Xavier to postpone the open day at the Montfort Pavilion on Friday, May 16th, because they considered that the information which they received in their March 4th, 2014 registered letter, to be ambiguous. Their request was denied. (Without a referendum, the adoption of the by-law is automatically sanctioned). The Mayor said that given other affected residents oppose such a delay, given this Friday, 16, is at the beginning of the first long weekend of the season (it is at eve in fact) and that official notices have been sent to the 38 affected residents respecting the time limit before the holding of such a register, the Council maintains the chosen date.
5.9. The Council adopts a motion authorizing the MRC to go to tender for the installation of the gates to control the access of vehicles on the Aerobic Corridor at Montfort and Newaygo. (See report of the Mayor)
6. Public safety 6.2 The Council authorizes a tender for manufacturing of standard civic address plates. $ 25 per property has already been collected for this purpose by the municipality; $ 10 or $ 15 will be added on the next taxes account, for a total cost of about $ 80,000.
9. Planning and zoning
9.2 Le parc de la Plaque tournante (Railway turntable Park): An attestation of formalization of this name has been issued by the commission de Toponymie for revamped recreation park of Montfort.
10. Recreation and culture
10.1 A special volunteers’ evening was held to thank the work of these generous residents; it has attracted 60 participants. Lake associations were invited.
11. Special projects 11.1 Shuttle on the Sixteen Islands Lake: the Council voted a motion of support to the Coopérative de solidarité des 4 pôles for the continuation of this mainly touristic project. Despite support for the launch of the project given by the former municipal Council of Lac-des-Seize-Îles, the new Council now refuses the pontoon boat mooring at the municipal wharfs. Opposition would come from property owners opposed to frequentation of the Lake by shuttle and tourists. The presence of the municipal wharfs is yet due to public investment by the Federal Government. The continuation of the activities of the shuttle, following the starting significant investment from the MRC des Pays-d’en-Haut, seems therefore uncertain.
Note: Submitted as simple information to our members, pending the release of the minutes by the municipality.
Carl C. | | Notice of registry period: Lake Thurson Road | |
| |  Municipal session of April 14th 2014 | Partial report of the session of the Municipal Council of April 14, 2014, in Montfort
Reports of the Mayor and Councilors Mr. Genest:
- A meeting on the shared way of the Aerobic Corridor took place in mid-March with the Regional Directorate of the Ministry of transport. The Department would accept that barriers be installed at Montfort and Newaygo in order to limit traffic on the Share way to vehicles serving the owners residing on that street. In a few years from now, residents of Docmanov and Mount Street will not be considered as eligible to use this road and will therefore have to use the proposed new access road on Lake Thurson’s side, if residents are in favour of its construction.
- The MRC is still studying the question of authorizing or not construction, currently frozen, of 'regional' or super shopping centres on its territory. Due to the impact of the proliferation of these centres is feared the disappearance of the small local shops so characteristic of the Pays-d'en-Haut’s villages. (See articles of the Journal des Pays-d'en-Haut / La Vallée, on pages 4 and 5, on the topic).
- 12% of what you put in your recycling bin goes ultimately in the trash; this is particularly the case when you put a stack of newspapers in a closed plastic bag. Current tooling cannot support this.
- In the next few years, organic materials should no longer go to the trash in Quebec. The municipality has thought about the use of brown bins; but to avoid additional collections, common places for collecting these kitchen wastes should be developed. One could, for example, carry his bag of organic matter while fetching his mail at post office boxes.
Administration: Notice of motion - draft regulation of loan for the construction of the Thurson access road. Mr. Genest: On May 16th, the day open to register at the Montfort Pavilion, unless enough owners concerned request the holding of a referendum, the by-law will be automatically adopted. The bill of $ 1 273 223 will then be shared between owners, based on a sophisticated calculation applied to the 43 affected properties. According to this calculation, $ 213,000 of the bill burden to the Municipality, unless its properties are sold. The sale of such land will not be allowed to be used for new constructions. But the current properties could be built on if they are not already; this is to allow those who would have such a project to carry it out. One of municipal lands could be used for the construction of a parking lot for the users of the Orphans’ Trail. The motion was adopted, with one councillor voting against.
Public safety An off road new vehicle was purchased, an Argo 8 X 8, for the maintenance of roads or trails too narrow or difficult to access. It may serve, for one, for maintenance of the Orphans’ Trail. The Argo will be stationed at Montfort, at the fire station.
Transport Some bridges on the territory of the municipality have limitations for the passage of heavy weight vehicles. This issue needs to be addressed.
Environmental health and environment: Bill creating the Environment Advisory Committee The bill is adopted. District 6’s Councillor, Ms. Louise Gour, in charge, named the candidates recruited to become members of this Committee, two per district. Mr. Jean Pierre Corbeil and Mr. Regan Moran will represent the Montfort sector.
Question period
- On the use and barriers for the aerobic Corridor: The bridge of Newaygo, currently blocked for safety reasons, will be consolidated and reopened to vehicular traffic. A camera will be installed and will be used, at the same time, to monitor the use of the waste and recycling shed at Newaygo.
- C. Chapdelaine: % required for a referendum to take place on the bill on borrowing for the construction of the Thurson road? Response from Mayor Genest: At the May 16th, 2014, signature (or holding?) of the register (period) at the Montfort Pavilion, the signature of 15* residents concerned (on 38) by the bill is required for a referendum to take place. A majority of votes one way or the other, at the latter, would then determine the green or red light for the project.
Submitted as simple information to our members, pending the release of the minutes by the Municipality. *The lesser between 500 and the number obtained by adding the number 13 and one that is equivalent to 10% of the persons eligible to vote in excess of the 25 first, when they are more than 25 but less than 5,000: a) 13 b) (38 - 25 = 13) X 10% = 1.3 -> 2 c) 13 +2 = 15
Article 553, Loi sur les élections et les référendums dans les municipalités Carl C. Article from the Journal des Pays-d'en-Haut - La Vallée | |
| | |  | Report on the session of the Council of the MRC des Pays-d'en-Haut (Held at Montfort Pavilion, on March 11, 2014)
Note: the Council of the MRC, or Council of mayors, consists of the latter under the chairmanship of the prefect, Mr. Charles Garnier. Its regular monthly sessions are held in rotation in the ten constituent municipalities. The agenda is published in advance on the website of the MRC. Everyone may attend and use the question period.
5. Development and environment
E) Report of the environmental advisor (Joël Badertscher) 1. Beaver dams (among others): The D G of the MRC, Me Yvan Genest, explains that the MRC is responsible for looking at the safety of these dams for downstream and upstream habitat. It must therefore act in compliance with the regulations when, among other things, it is aware of a danger. It could be pursued in case of breach on this obligation. In practice, agreements with constituent municipalities allowed it to delegate part of its obligations. A series of interpretations of legislation have been developed to facilitate this delegation of functions. An Ad Hoc Committee is currently reviewing regulations and its multiple extensions to ensure greater coherence.
2 & 3. Residual matters management (PGMR): An agreement between the MRCs is under consideration. Organic materials: $200 000 is allocated to the PGMR for pilot projects. (The Government foresees that all municipalities will move quickly to stop organics from ending up in the trash.)
4. Detailed mapping of wetlands: Mr. Badertscher explains that tracking recently was completed through fieldwork and the use of aerial photography. But they hope to have this year more adequate aerial coverage. Abrinord entrusted the task to its partner, Ducks Unlimited. A request for financial support was presented to the CRÉ. The prefect announced that the request will be considered Thursday.
6. Reports
A) In charge of rural development (Alison Drylie)
2. Culture and heritage: $324 600 for 2014.
B) In charge of urban planning and heritage, VVAP (Ana Manescu):
3. Confirmation of a $30,000 contribution over three years from the Ministère de la Culture et des Communications. It will allow the realization of 3 projects.
4 Domaine de l’Estérel’s commercial and community Mall: Part of it was classified a heritage building.
C) In charge of recreational development (Chantal Ladouceur)
2. Strategic plan for the development of mountain biking: Following the forum of 2012 on this activity, a study has been completed and delivered to the councilmen. The SOPRÉ endorsed the conclusions of the study. The intervention plan focuses on Western municipalities of the MRC, such as Wentworth-Nord.
7. Parc régional des Pays-d’en-Haut
B) Interconnection issue
3. Hiring of a communications firm: According to Me Y. Genest, the issue has been in question for about 15 years, be it shared way, cycling trail, one-way, etc. At the question period, Mr. André Soucy asked what portion of it will be shared way. The answer was: all of the 11 kilometers. ‘Then what’s the problem with the shared way in Montfort?’, asked Mr. Soucy. Mr. Y. Genest replies that he will argue this aspect, as already noted by Mayor Genest, with Ms. Sylvie Laroche, Regional Director of the Department for the Laurentides-Lanaudière. The contract must be awarded in April for the work to start in May. But this will only be a step. It is a project of $2 to $3 million, and the MTQ will pay half of it. Councilwoman L. Lapointe, of Saint-Adolphe-d’Howard, or Gilles Boucher, councilman of Sainte-Marguerite-du-Lac-Masson, hold the view that their municipalities also deserve to enjoy connections or other interface to the Aerobic Corridor for one or to the Parc linéaire du P’tit Train du Nord for the other. Faced with the difficulty to reach the last portion of the Corridor, Me Yvan Genest took the opportunity to reiterate his conviction that this recreational way remains a treasure to be discovered.
8. Files of the prefect
B) Development Plan for collective transport for the four contiguous MRCs 1,5 cents per litre of gasoline will be devoted to the improvement of public transport; it means a lot of money. A firm has been tasked to develop an approach based on the experience of the Gaspé Peninsula.
14. Question period (refer to 7B)
Note: all information contained in this summary and partial report should be checked at publication of the minutes of the session before being resumed. It has no legal value and will be a first experience.
Carl Chapdelaine | | up | |
|  Municipal session of March 10th | Proceedings of the municipal session of March 10, 2014 (held in Laurel)
4. Reports from the Mayor and the presidents of committees
4.1 Referring to the freeze decreed by the MRC on the projects of malls on its territory until be promulgated a regulation governing their implementation, Mayor Genest explained the fears that mayors have facing the concentration of services while the right for decentralization in favor of residents questions them.
5 Administrations
5.6 (Thurson sector access road) The Mayor precise that residents directly affected by the proposed borrowing by-law for the Thurson sector road which will serve them (and for which they will have to share the cost), but who are opposed to it, can sign a registry eventually set up for this purpose. (These residents have recently received a letter making them aware of the draft regulation). At the question period, we are asking for clarification of the official procedure to be followed by the administration. The Mayor explained that the notice of motion is only a first step in this procedure. He stressed that before the Bill is presented and adopted by the Council, concerned residents who would like to oppose will have the possibility to sign a register. A proportion, to be determined, having registered their opposition would lead to the abandonment of the by-law. The date of 16 may (for the opening of the registry?) is mentioned on the letter to these residents. In the absence of registered evidence of the rejection of the project as thus described, we understand that the by-law would be presented and adopted without further discussion at a future session of the Municipal Council. Councilman André Soucy will remind us that the recipients of the letter were invited to send their questions to the municipality. Mayor Genest says that his original intention in this project is to allow first and foremost to residents who have no septic tank, facilitate access to the machinery to have such installed and to comply with by-law Q-2,r.22 . He adds that the latter was amended in 2013 to increase to $ 500,000 the maximum fine for an offence under the Act by an individual. The road would be the ideal solution according to him (having regard to all the advantages of a road). In a discussion on the appropriateness or not to go ahead with the by-law without prolonging the consultation, were then opposed two points of view: for the Mayor, it was now time to proceed; for us, that would be taking the risk then to cope with a rejection of the project by the affected residents. A rejection would therefore mean the abandonment of the road project. The Mayor adds that the offer from the municipality is most beneficial since it will allow these residents to enjoy a road of 6 meters in width, constructed according to standards and at the same time taken care of for its maintenance. He added that many people in the territory of the municipality, are asking for such roads and for such transfer (from private to public roads?); but that priority is currently given to the Thurson sector project. Even without road, affected residents will have to comply as soon as possible with the rules in force concerning the septic systems, said the Mayor. They will then have to rely on the use of a barge or other appropriate means. The municipality would have a second by-law ready, this time for the area designated as 'Sunny Side'. In this case however, it seems better accepted by the residents involved. The very contentious issue of the distribution of the cost ($1 276 223) between residents, depending on the delimitation of properties in connection with the projected road (?), and for which the detail seemed to accompany the letter they have received, has not been addressed here. However, it could prove to be, next to the magnitude of the total cost, object of incomprehension and rejection of the project of the by-law for several.
8. Environmental health and environment
8.1 Notice of motion - project for the creation of an Advisory Committee in environment. This Committee would be in addition to those existing in urban planning and other areas for which the municipality seeks to have a consultation by representatives of the three sectors of its territory. The Mayor invites particularly the presence of representatives of associations of Lakes to the future Committee. It seems that many residents have already expressed their interest to serve.
9. Planning and zoning
9.4. 9.5, 9.6 Several regulations were adopted (MRC or municipality?) to clarify the rules regarding the use of the right-of-way of the Aerobic Corridor for a installing any structure. This regulation will facilitate the intervention of the authorities in compliance with the legislation.
10. Recreation and culture
10.2 Current territory delimitation of the CSSS of Argenteuil and of the Pays-d'en-Haut does not allow a beneficiary to go to the most accessible service from his residence. Request is made to Health and social services of the Laurentian region Agency to find a remedy to this problem.
Note: This report is pending the publication of the minutes by the municipality. (To be amended according to the comments of the Executive of the Association and/or the Mayor.)
C. Chap | | up | |
|  Minutes of 2013 ALSFX Annual General Meeting | Lake St. Francois Xavier Annual General Meeting July 27, 2013, Montfort Pavilion (minutes to be submitted at next AGM) 1. Call to Order; The meeting was opened by Raymond Noel at 9:40 am 2. Opening Remarks; Dave Clark addressed the assembly by welcoming everyone and thanking the members for their support and interest in the health of the lake. The need for a growing membership, participation in activities and involvement in programs was very important for the protection of our lake. Today we are ever concerned with the importance of the watershed and that we must protect and preserve its total environment. Topics to be covered are: a)Financial Report- Edna Schell b)Lake Health- John Wilson c)Lake Usage Raymond Noel d)Communications Carl Chapdelaine e)Membership &Social Events-Colleen Horan A final outcome to the Lake Thurson Class Action will also be presented. The final message was to tell the community to stay alert because every year there was increasing pressure on the lake and its environment. Whatever is presented today will be on the LSFX website. Dave thanked Adrian Hausermann for his participation and valued work on the executive. He also mentioned Tony Chiesa, a long time member that brought inspiration and calm wisdom to every meeting that was held in the past.
3) Approval of the Proposed Agenda; Addition of Road Access to be answered by the Mayor in his presentation. Accepted by Yves Jegou 1st and 2nd by Helen Perrier, all in favor and accepted.
4) Approval of the 2012 Minutes of the AGM Approved 1st John Bowles and 2nd by Joe Schell, all in favor and accepted 5) Financial Report by Edna Schell Revised actual members 74 at$ 40.00=$2960.00. Edna thanked those who gave donations to the fish fund. Please see the report for more details. A motion to accept the result of the financial report for 2012, 1st Anne Folger, 2nd by Louise Bulmer and accepted. A motion to accept the proposed Financial Report for 2013, 1st SJWoods, 2nd by Andre Soucy and accepted. The financial report can be viewed on the ASFX website.
6)Portfolio Reviews Lake Health-John Wilson Lake Usage-Raymond Noel Communications-Carl Chapdelaine Membership and Social Events- Colleen Horan All presentations can be viewed on the LSFX website Portfolio Wrap up; Dave Clark “As you can see, we are on a broader path and are exploring many new areas as well as thinking of what we have been doing in a different, more focused way. New initiatives are underway and more will start as to the work we are doing, which generate new knowledge and new ideas. Our big challenge is time. We are only eight and the pace we can set is frustratingly slow. There is old English saying “Many hands make light work”. I encourage you to take an interest and to get involved. It doesn’t have to be a lot of time .Just a few hours to review findings, do a little research and input your views and ideas would go a long way and would be much appreciated. 7) Municipality Note Mayor Andre Genest stated that letters will be sent out to residents of Lake Thurson, Chemin de Fer and Montfort to the bridge Sector as well as the Sunny side Sector, notifying them of an August 16th meeting dealing with road access. The Municipality has now a better idea of the costs involved. They will redo the barriers on the Chemin de Fer with special priviledge to owners of that sector. Sunny Side Sector (5 houses) want a 6 meter road into either Hunter or MacDonald road. The Municipal park has been revamped and improved and they are working on the parking problem. The bike and ski path is almost finished, and they are looking at September for completion. The Mayor would like to thank the residents for the cleanliness of the beach area as well as the Newaygo marina area. He reminded everyone about the dumpster bin in August. 8) Executive Slate A motion to keep the executive for another year was accepted by 1st Kenny Watson and 2nd by Antonio Gomez Moriana, all in favor and accepted. Shelagh Jane Woods offered to volunteer to join the executive as treasurer. There was a unanimous informal agreement from the membership and Shelagh J. Woods’ name was added to the executive slate and was approved as part of the executive slate. Edna Schell volunteered to take over the vacant position on the executive as a director. President- Dave Clark Vice President-Raymond Noel Treasurer- Shelagh Jane Woods Secretary- Colleen Horan Director- Carl Chapdelaine Director-John Wilson Director-Louis Quenneville Director-Edna Schell
9) Class Action Closure- Dave Clark presented his final summary of the Class Action which can be viewed on the ASFX website.
10) Question Period Dave Zgodzinski-Why create another organization that will be looking after the welfare of the lake when one already exists that has a long history and why doesn’t the Corporation donate funds to the Association? There would be no overlap and no necessity of 2 sets of meetings and committees. Dave Clark-The Association can come to this nonprofit organization, seeking funds for projects and initiatives if they are directed at improving and preserving the environment. I suggest that you address this to the lawyers involved. Gar Gibbs-I personally propose that the money go back to the Municipality from the settlement. I pledge my portion of the settlement to Laurel.
Dave Clark-It was in everyone’s interest to settle out of court. Had the developer not disappeared we would have gone to court and ended paying much more .We wish to remind the people that all three parties were responsible for the damages. If you disagree you must send a letter to the lawyers. M. Miles- I want to thank all the volunteer firemen who came to Sunnyside to help clean up and restore power after the thunderstorm. SJWoods- will we see the constitution of the Environmental Fund on the Website? Why did you decide to set up an Environmental Fund? Dave Clark- Yes, we can put the constitution on the website. Our first idea was to buy the Thurson property and develop a parkland and give it to the Municipality. This proved to be impossible. The purpose of the Class Action was for the protection around the lake. Distributing the money among the residents did not meet our objectives. When the fund was discussed, it became apparent that the Insurance Company became very positive and made the settlement discussion a lot easier. The court was very positive when this was presented as a way to distribute the funds. Neither the court nor the insurance company told us to set up a fund, but the response to it was good and made the process go easier. Diane Jegou-is there a legal precedent to this Class Action Dave Clark- no precedent. We agreed not to fight but to settle out of court for a sum of money. Louise Bulmer- Thank you Dave for your time and effort but how do you dish out the monies to those who sent out invoices for damages-who determines who gets what and how much? Dave Clark-This is not about remunerating the individual. The data obtained helped the lawyers to determine the amount of damages incurred. However, you have time to send your letter to the lawyers and a judge will make his decision. Mark Dunn- Where can we get the information and studies on road access? André Genest,- Mayor-There are the Docmanov and Thurson and Sunny Side studies which touch about 59 residents. A letter has been sent to these residents telling them of a meeting to be held August 16th2013. If other residents are interested in a road they should get in touch with the Municipality. There was also a feasibility study done and a meeting was held May 2013 for the residents. Gar Gibbs-Municipality is doing work on the bike path. With the damage of the thunderstorm and trees fallen over the path I wish to help the Municipality and put together a crew to help clean up the debris. Meeting adjourned, moved by Joe Schell and accepted Submitted by Colleen Horan, Secretary, LSFX. | | up | |
|  Report on the Municipal Council meeting in Montfort | Mayor Genest presided over the session held at the Montfort Pavilion this October 1, 2013. In his report, he mentions, among other things, the renewal of the Rural Fund, managed by the MRC (and from which has benefited Montfort Park). He believes, with the Mayor of Gore, to see expanded assistance to the improvement of sanitation program, which would perhaps subsidized a portion of the costs of upgrading required for isolated residences. Funding for roads, applicable to Route Principale, is also in sight. Finally, he must soon meet with the Regional Director of the Department of transportation, about the shared way of the Aerobic Corridor. In additional item in the agenda, Councilor André Soucy wishes to emphasize the third consecutive victory of the Viking canoe-kayak Club at the speed national championship which took place at the Olympic Basin in Montreal, on September 1. He also took the opportunity to congratulate the Mayor for its tendency to promote the development of outdoor equipment in the municipality. He emphasised with the realization of the Orphans’ Trail, including the recent "Thankless job" for clearing of small parallel trails that led to the publication of an article in the journal Accès Laurentides. The audience finally joins elected officials for farewell to Councilor Payette at the board of the Council and thanks him for his mandate. The question period will come with the suggestion of a resident for the indication of a hidden exit where Route Principale crosses the Aerobic Corridor, in Montfort. This crossing constitutes a significant risk to users of the recreational pathway. The Mayor is rather in the idea of installing a standing sign in the middle of the road, during the summer season, and that certainly (except for experienced pilots) would lead to slow down vehicles. Mention is also made of the soon coming paving of the Chemin de Montfort and of the role held by Councilor Soucy in the pressure exerted on St. Adolphe-d’Howard on that issue. Another speaker hope councillors highlight as much cultural events as the sporting exploits that honor our municipality. He would also appreciate that the Canoe-kayak Viking Club, which benefits largely from the recreational facilities of the Montfort Pavilion, associates more closely its fame to Lake Saint-François-Xavier and the municipality of Wentworth-Nord,rather than that of Morin-Heights. (Please later check the content of the session in the minutes to be eventually published by the municipality on its website.) C. C. | | up | |
|  Report on the Municipal Council meeting of September 9, 2013 | Sept 9, 2013 Held at Laurel 2. Recall that the next regular session of the municipal Council will be held on Tuesday, October 1st at the Montfort Pavilion. The advancement of the date is due to the time required between the last meeting of the Council and municipal elections on Sunday, November 3. 5.1 (Administration) Mayor Genest plans a surplus of $ 400,000 on the municipal budget of approximately 4 million. Detail cannot be specified until after the municipal elections, in the Mayor's report. It will be specified in the question period that the debt is about 1.3 million. 6.1 (Public safety) Commenting on the activity report, the Mayor recalls the excellent service provided and takes for example the answer to the unfortunate event of July 28, in Wentworth-Nord, when a balcony where guests to a baptism had taken refuge collapsed 15 feet lower, and 58 wounded had to take the direction of various hospitals. 9.4 Montfort Park will be called: "Parc de la plaque tournante" (Park of the railway turntable), in memory of this mobile piece of railway, where the locomotive from Morin-Heights could be redirected towards this village and pick up the cars left on the track. An interpretation panel should explain the fact. But we are looking for a photo of the former turntable for the panel. If you have one, please remove it from your album... 10.1 The municipality will present the candidature of the Group "Laurel ma Muse" at the "Grands prix de la culture des Laurentides 2013", 24th edition. 11.1 The contract for the construction of a shelter on the multi-use trails at Montfort (the Orphans’ Trail) was given to la Coop des 4 Pôles, the lowest bidder. Question period The Council was questioned on the intended use of the budget surplus. Two possibilities are already on the table, responds the Mayor, including the purchase of land for the extension of municipal buildings. Finally, the Mayor announced that the opening of Orphan’s Trail will take place on Thursday, October 3, at 10am. Member of Parliament, member of the National Assembly, mayors and other personalities will be invited, in addition to the population. The idea is to pick up interested persons at the Montfort Pavilion by a bus to bring them near km 13 of the Aerobic Corridor where the trail leads directly on the latter, while cyclists will arrive by their own means. C.C. | | up | |
|  Report on the Municipal Council meeting | July 11, 2013 The Municipal Council session took place in Montfort, on July 8, 2013
4. Legislation 4.1 report of the Mayor and the committees:
- Traffic on the aerobic Corridor (Rue du Chemin-de-fer) - Mr. Genest requested and obtained from the MRC funds to mount a case showing the costs to incur for the owners of residences bordering the aerobic Corridor, shared way, to abandon using it, failing to keep it as road access.
- Septic installations of residences without road access - Mr. Genest is surprised that no resident concerned by this issue has expressed interest in the proposal of service by barge. A letter from the municipality will be issued to these residents next week. No mention of publishing the long-awaited Power Point presentation of last May 19 on the website of the municipality.
- Meetings by sector - The municipality will participate in meetings by sector with interested residents to give them more details about the proposed options and the respective costs (depending on the number of residents to share the bill for an access road or other).
- Subdivision on Lake Thurson side - Mr. Genest summarized his presentation to our vice-president, Raymond Noël, on clarifying his remarks during the presentation of May 19 on the subject. To not hide anything, he had estimated at 165 the theoretical possibility of additional houses. However, since some of these lands are municipal and on which no private construction will be allowed, the theoretical number already comes down.
Mr. Docmanov said that he had in mind the construction of a dozen houses on his land. Moreover, it is unlikely that future residents simply use the minimum space required by the by-law for the construction of a house. So an order of magnitude much smaller than the theoretical figure should correspond to the future reality of any subdivision of this sector. The costs of the access road which is there projected for the residents of lac Saint-François-Xavier would eventually be distributed among all owners along this future street. 5 Administrations 5.1 An amount has been awarded for the feasibility study entrusted to a firm on the implementation of septic systems at residences without road access. 7 Transports 7.2 Ms. Nicole Cabana will replace Mr. Carl Montreuil, who has resigned from the position of Director of the Department of public works. 7.4 The Line Boudrias Company was awarded the contract for mowing on certain streets. 9 Planning and zoning 9.3 Minor derogations - Cottages could be built in the trees in St. Michel, as designed by hostel owner who wants to add units to its offer of accommodation. The urban Planning Committee had recommended the derogation. 9.4 There is an existing by-law that prevents the construction of any boat launching ramp, a dock, etc. on a vacant lot on the edge of a lake in the municipality. This regulation was under revision and the latter was presented for public review before the current session of the Council. Some people were present at that consultation. This revision, which does not affect the prohibition of building on such land, was adopted. The fears of our Association on this aspect should therefore be defused, according to the Mayor. 9.5 The Napée project, in gestation for many years in the sector of Lake Pelletier, was accepted by the Advisory Planning Committee and the Municipal Council. This project provides the originality not to subdivide the shoreline and to allow common access areas. 11 Special projects 11.2 Montfort Park fitting out contract - It is proposed and agreed to grant a sum $ 32, 214 to complete the landscaping of the Park, with picnic tables, fence, grass, etc. 12. Question period Channel obstruction at Montfort - I want to ask Mr. Genest what action the municipality intends to take concerning the channel under the bridge at Montfort, obstructed by sand and gravel from the hill of Rue Principale, topic addressed by Mr. Jean Pierre Corbeil with the municipality. Mr. Genest interrupted me to inform me that this issue is under the responsibility of the Ministry of transport. Coming back with a question about long term solutions envisaged to address the problem, the Mayor told me that they are well known; retention basins have to be dug under the outlets (manholes) which will of course be emptied of the supply of sand and gravel when necessary. A meeting was held with the new Executive Director of MTQ on this subject. The lake water level - I then addresses the issue of the abnormally high water level of the Lake, several shore residents seeing there the origin of the loss of land and suspecting it may not be natural. Mr. Genest tells me that the level of the Lake (the altitude) was determined during the events of 1990 and that it is ensured that it be maintained as well. I understand that, in the Mayor’s mind, only weather explain the current level of the lake water. Mr. Yves Jegou continued with other questions and explanations on the subject. Indicator panel, corner Route Principale and Sainte-Marie - Mr. Yves Léveillé reports the poor condition of this panel and asks what the projects of the municipality are in this regard. The Mayor speaks of the project of the municipality, in collaboration with the MTQ, to acquire a part of land over the head of the T at this crossing. There, a new panel would be visible when arriving at the village, as well from Chemin Sainte-Marie as from Route Principale. There especially would be a parking space so as to be able to stop for a more detailed look at information on the panel and allow the visitor to make is mind.
Submitted without prejudice to our members, pending the publication of the official minutes by the municipality. Carl Chapdelaine | | up | |
|
REGULAR SESSION OF JULY 8, 2013 AGENDA
1. ADOPTION OF THE AGENDA 2 MONITORING AND APPROVAL OF THE MINUTES OF THE REGULAR SITTING OF JUNE 10, 2013 3 CORRESPONDENCE 4. LEGISLATION 4.1 Reports of the Mayor and the presidents of committees; 4.2 Adoption of regulation SQ02-20-13-363-2 amending SQ02-20-12-363 alarm systems; 5 ADMINISTRA TION 5.1 Acceptance of reports of wages, procurement, disbursements and purchases of immobilization of the month of June, 2013; 5.2 Filing of financial statements and comparative States to 30 June 2013; 6. PUBLIC SAFETY 6.1 Submission of activity reports of # 2013-12 and # 2013-13 pay periods; 6.2 Hiring of a firefighter aspiring for the Montfort sector; 6.3 Termination of a firefighter aspiring in the Laurel area; 7. TRANSPORT 7.1 Resignation of an employee in the Service of public works; 7.2 Hiring of a Director of public works; 7.3 Tender invitation for the lineage of some streets of the municipality - contract award; 7.4 Tender invitation for the mowing of certain streets of the municipality - contract award; 8 ENVIRONMENTAL HEALTH AND ENVIRONMENT 8.1 Application to change the positions of restrictions and validation of the name of certain bodies of water of Transport Canada; 9 PLANNING AND ZONING 9.1 Submission of the list of permits issued during the month of June, 2013; 9.2 Record of the meeting of the Advisory Planning Committee of the 2013 20june; 9.3 Minor Derogations; 5.8 Adoption of the second draft regulation # 2013-271-6 amending the provisions of the zoning regulation # 2010-271 and its amendments; 9.5 Notice of intent - project's management Napee Inc.; 10 RECREATION & CULTURE 10.1 Grant to the Organization "Caregivers of Laurel" for activities for the community. 11 SPECIAL PROJECTS 11.1 Land Reserve; 7.0 Tendering Invitational # 2013-06-01 - Montfort Park - contract award contract; 11.3 De St-Michel Church - evaluation terms of reference of the work - the PIQM 5.1 program grants; 12 VARIA 12.1 Letter of solidarity with the victims of Lac-Mégantic; 13 QUESTION PERIOD 14 ADJOURNMENT OF THE REGULAR MEETING | |
|
|  600 rainbow trout at the lake! |  |
| | |
| They originate from Pisciculture Mont-Tremblant, thanks to the Lake St. François-Xavier Fish Fund and Lake St. François-Xavier Association.
Click on the arrow below the black screen to start the video.
| |
| |  Photos of trout restoking |
|  |
| |
|  Report on the Municipal Council meeting of June 10th, 2013 | June 11th 2013 Mayor Genest chaired the meeting which was held at Laurel. The attached agenda (in French) indicates the contents of the session. I underline the points that have most interested me. Feasibility study: Concerning this study at Lake Saint-François-Xavier, for upgrading septic systems, you remember that four sectors have been identified. We understand from the mayor's words that the mandate to clarify the terms of interconnection of the Sunny Side area to thoroughfare had been added to the current contract with the Laurentides Experts Conseils consulting firm. On the other hand, as regards the sector of Lac-à-la-Croix, such a mandate (to evaluate the terms of the construction of a road) would be granted only once residents would have been consulted and their choice of an option determined. We are always checking for the posting of the Power Point presentation on the website of the municipality. Recreational trail: Mayor announces that it becomes ‘The Orphan’s trail. It is a bit because it is built on so-called orphaned lots, eventually inherited by the municipality. But the name wants above all to evoke the past of Montfort, the village created to accommodate the huge orphanage, now demolished. Look in: Photos of the month Rest area at the aerobic Corridor: The municipality asked (to the MRC, to the Department of transportation?) that be provided a real roadside rest area, with parking and bathroom (s), at the crossing of the Corridor with Route Principale (the main road connecting Montfort to Laurel), near the crossing of Hydro-Québec high voltage lines. The Mayor recalled that only a picnic table (and the possibility to park owns car?) is actually on that spot. Look in: Photos of the month Resignation: The Director of the Department of public works, Mr. Carl Montreuil, submitted his resignation. The Council accepted it at this session. In addition, two other members of the Town Hall staff are retiring.
By Carl Chapdelaine, without prejudice and pending the minutes which will be eventually posted by the municipality... Official reports from the municipal sessions of January, February, March and April 2013 are now available on the website of the municipality of Wentworth-Nord: http://www.wentworth-nord.ca/index.php/conseilmunicipal/reunionsconseil/procesverbauxconseil/proces-verbaux-2013 up |
| |
|  Success of the presentation of the feasibility study | This Sunday afternoon of May 19, there could well have been nearly a hundred people in the Pavilion room, including the ones facing the assistance. Mayor Genest presented the context of this study on the project of access roads for the upgrading of the septic installations in areas without such roads at Lake St. Francois-Xavier. Then Executive Director, Madam Bélanger, and the Director of the environment, Mademoiselle Robitaille, briefly outlined the history of this issue. Most of the presentation was in French; but the content was often reproduced in English. Then came the engineers of the Laurentides Experts Conseils firm, Luc Brazeau and Alexandre Guay; the first would deal with access roads proposed; the second would present the options regarding the choice of septic systems. These routes, such as septic installation options, were associated with the four proposed geographical sectors: Sunnyside, Thurson, Lac-à-la-Croix and Chapdelaine. They were based on local constraints. The last two sectors would probably be part of a second phase. The residents were able to glimpse what was proposed for their own sector. Very many questions and comments would come from assistance during the presentation and question periods. It was an opportunity to collect some of the reactions from the owners concerned by the project. When the time came to separate assistance in two main groups, according to a grouping of sectors, it is rather a multitude of small groups of neighbors, city officials, including councillors, and the two engineers who exchanged on issues of the project or consulted the explicit maps that lined the walls of the Pavilion. The municipality promised to put the Power Point presentation available to Internet users and planned to send a new letter to the residents concerned for the following. Residents have visibly to make their choices regarding the type of road or rather the choice of a barge; respective costs being a main concern. The interest of the assistance has been manifest if one relies on the persistence with which all attended the meeting and shared their views. Some however seemed to expect more consultation and remained unsatisfied in this chapter. Will have the position of some and others about the project and its many facets evolved today? It is difficult to affirm it. Want to share your opinion? You have learnt about things others would like to know? Start exchanges in our forum. Carl Chapdelaine | | ALSFX Forum | |
| |  Report on the Municipal Council meeting of April 8th, 2013 | As usual, there were few people in the Montfort Pavilion; Roger Ponce, Yves Léveillé, Yves Jegou, and some other rare regulars, as well as David Zgodzinski, were included. Representatives of a group of Laurel wishing to maintain a social place to gather children had also appeared at the beginning. They were accompanied by a dozen children, including a few toddlers, holding bilingual signs that they had made themselves and claiming the attention of elected officials. Apart from the hiring of a firefighter for the sector of Montfort, few subjects specifically related to district 5. The question period brought on the table the question of ambulances and the lack of concrete answers to the claims for a better service. It was then my turn to remind the Council that our association’s Executive had made a request to the municipality concerning the future of the advisory Committee on Orphan lands. We wanted that be implemented an expanded committee replacing the latter and which would constitute a privileged instrument of consultation with the community. Any issue in the region of Montfort might be addressed by that committee. For so doing, districts 5 and 6 would be covered by the jurisdiction of such a body. Mayor Genest answered me that the "Presentation of the Lake St. François-Xavier feasibility study" (on the access roads needed for the upgrading of septic systems) to which our Executive had been expressly invited on April 6, gave somewhat a follow up to the will of collaboration between us already embodied in the mandate of the Committee on Orphan lands. Our request would be surely considered. On the occasion of a question about the conduct of the class action in the Thurson (Thurston) case, Mayor Genest added that consultation between the municipality and the Association could further materialize now that an out-of-court settlement regarding this appeal was about to be formalized*. The presentation of the feasibility study to which was referring the Mayor will resume in public, probably on Sunday of the Journée des Patriotes/Victoria’s weekend, i.e. May 19, he added. We should soon give you a report of the meeting which took place on April 6. There was also a question about the evolution of the rehabilitation of the Chemin de Montfort. The Mayor expressed his exasperation facing the slow motion of the work and stated that the municipality of St. Adolph-d'Howard was presently looking at the development of a financing package. By Carl Chapdelaine, without prejudice and pending the minutes which will be eventually posted by the municipality... | |
| |
| * See the "Mayor's report", in the minutes of the municipal meeting of March 2013.
Official reports from the municipal sessions of January, February and March 2013 are now available on the website of the municipality of Wentworth-Nord: http://www.wentworth-nord.ca/index.php/conseilmunicipal/reunionsconseil/procesverbauxconseil/proces-verbaux-2013
RSVL (municipal contribution): You will notice further in the same March report that the Council has accepted a proposal from Councillor André Payette to reimburse, up to 50%, laboratory water analysis fees charged to Lake associations by the authorities of the VLMP (RSVL) when these are required, which is our case for this year and probably the following.
Note: The agendas of the Municipal Council sessions in Montfort were available in English a year ago; however, I haven't seen any since; I am sorry. up | |
|  Minutes of 2012 ALSFX Annual General Meeting | Lake St. François Xavier Association A G M July 21, 2012, 9; 30 A.M. Montfort Pavilion, (Note: Minutes to be moved at 2013 AGM.)
1. Call to Order. The Meeting started at 9:45 A.M. 2. Opening Remarks; Dave Clark, the president of the LSFX Association started the meeting with his opening remarks on the Association’s 3 main objectives for the coming years -
- to preserve and protect the lake and its environment
- 5 new portfolios with leaders to establish small working groups
a) Financial -Edna Schell b) Lake Health-John Wilson c) Lake Usage-Raymond Noël d) Communications-Carl Chapdelaine e) Membership and Social Events-Adrian Hausermann
- For the residents to engage in their local environment from being a passive to a
more active group and to achieve a total community effort to participate in our portfolios with committed involvement.
3. Approval of Proposed Agenda Motion to accept the agenda, first by Joe Schell and seconded by Jacques Leblanc. 4. Approval of the minutes of 2011 AGM Motion to accept the minutes, first André Genest and seconded by Felix Hausermann. André Soucy would like to see the printing a little bigger in the future. The AGM minutes will be available on the website.
5. Fish Fund Update and Continuation Last year’s award for the biggest fish(13lbs) in the adult category awarded to Pierre Gauthier with a trophy .There were no junior awards this year. Edna Schell gave a summary of the Andrew Schell Fish Fund Legacy. Since 2002 her son asked that in lieu of flowers the $3000 received would be put to a fish fund. It was voted by the membership in the past that $5.00 from the membership went towards the fish fund and was matched by the Andrew Fund Legacy. As of today there was only enough money for next year’s fish. It was decided by the Schell family that the name Andrew be dropped and that the Fish Fund now would become a community project and be called LSFX Fish Fund. Edna and her family wished to thank the members for their support and hoped that the Fish Fund would continue. The executive was unanimously in favour of continuing this Fund and made a motion to raise the membership by $5.00 to contribute to the Fund. Agreed first by Joe Schell and seconded by Jacques Leblanc. A vote taken by the membership. There were 32 people present and 20 votes registered positive .Motion passed. Please send a photo of your caught fish, measurements and weight to Edna Schell by e-mail by August 15th for next years’ Newsletter.
6. Portfolio Reviews; Lake Health -John Wilson Lake Usage- Raymond Nöel Communications-Carl Chapdelaine Membership and Social Events- Adrian Hausermann
7. Portfolio Review Wrap -Up The presentations given by the executive is an idea of what we want to achieve and the process we are following to get there. Our objective is to progress from reactive mode of operation to preventive mode. We wish to get you involved in the future of our lake by working together in collaboration with the Municipality and the MRC. We are asking not only the residents of the lake but the villagers of Montfort and surrounding areas, mostly all the people connected to and enjoying this paradise, to participate. Please fill the volunteer sheet and get involved and make a commitment. 8. Financial Report and Approval; 4 years ago we paid $500 to participate in a study run by Dr. Carignan of the University de Montreal. Samples have been taken from our lake once a month for the past few years by an executive volunteer with a secchi dish and the results sent to RSVL for data at no extra cost to the Association. This program is ongoing, however the 5th and 6th year the government wants to make tests for phosphorus at an extra cost of $300.00 for 2013 and 2014.We do have funds allocated to cover this expense in our budget. Therefore we need a motion for a vote to accept this. A motion was made to continue with RSVL ,first Louis Saia, seconded by André Soucy. A vote taken 25 in favour, motion passed. Edna makes a motion to accept the proposed budget .Jane Woods first and Heather Ball seconds. A vote was taken to accept the financial report. 20 voted in favour Motion to accept the budget for the next year 2012-2013, first Heather Ball and seconded by Joe Schell. Edna stated that she would like a volunteer to sit with her so she could train that person to take over in the future.
9. Executive Slate Approval; A vote to accept the present executive members passed with 20 votes in favour. We would like interested people to be on an emergency type roster for future meetings. 10. Class Action Up-Date; A summary by Dave Clark - 2013 trial is underway
- there was a change of counsel, new firm Savonitto & Ass. Inc
- we have no outstanding expenses
- out of court settlement seems imminent
11. Open Question Period - André Soucy congratulates Carl Chapdelaine for his work on the website .
- Vivianne Watson brought up a boating issue of priorities for water skiing and the call of the police for overriding time limit. Neighbourhood watch is good but!!!
- Louis Saia states that there are no priorities for water skiing
- Raymond states that some dangerous boating exists and that our group is trying to set up a process that is fair and secure. The boating bylaws must be respected.
- Louise - fast bikes on the aerobic corridor were a hazard. The garbage pickup in summer every 2 weeks was not viable. Executive answered that this is a Municipal bylaw.
- Eric Johnson comments that too many people believe they have acquired rights, in reality we do not have these rights,i.e. illegal parking, putting garbage anywhere and putting boats in other people’s spaces.
- Diane Jegou thanks Adrian for the Green Day and delivering pamphlets to individual homes. Nice to see that the village people are included.
- Dave Clark would like to put boat wash back on the agenda, but we need help to implement this task. We need the Municipality and the MRC to get involved to have a better control of the lake usage. They have land by the lake that is accessible to people with boats. We need to form an alliance or partnership with the Municipality allowing us to get full control of the lake access
- Raymond Nöel wants to expand neighbourhood watch, someone designated to talk to people about boat washing, to have boating equipment in place and monitored.
- Yves Jegou asked what was new about septic systems after the study done by the Municipality, how many fixed and what was happening about the road.
- Dave Clark states that the association is keeping a close look at these events but it can’t do much. It is between the Municipality and the residents to comply to the regulations. There are provincial regulations that apply to the septic systems/roads/orphan lands.
- Deputy Richer stated that they were working on sewage solutions, improvement of the roads, ambulance and first response.
- it may be a good idea to set up working groups on septic installations to represent residents and the Municipality.
- Stephany Dunn is concerned with the roads and septic system and if there was to be access through Lake Victor.
- André Genest states that he is willing to work with the residents about the septic installations but discussion of the above topic was not in our Agenda so it will not be discussed at this meeting. He would like someone from the Association to work with the Municipality.
12. Meeting Closure. Motion passed and accepted
Submitted by Colleen Horan ,Secretary LSFX | |
|  Report on the municipal Council session of January 14th, 2013 in Montfort | 4. Legislation (reports)
- In its report from the Mayor, Mr. Genest related that the Municipality of Morin Heights wants to prohibit its' firefighters from being used in another municipality. This policy will deprive Wentworth-Nord to recruit these people as volunteer firefighters, while the municipality has just invested in the development of its infrastructure and modernization of its equipment.
A firefighter on appeal should not reside more than 15 kilometres from the station.
- The Mayor comes back on the issue of transport: Taxibus and paratransit. Only a handful of users use a service that costs thousands of dollars to the municipality. A new circuit will be proposed for the Taxibus; it would start from Lac-des-Seize-Îles South rather than North. It would serve Laurel and Montfort for, in the end, reaching Saint-Sauveur. The round-trip would take place in the morning and in the afternoon. It would allow the time connection with a bus from Saint-Sauveur going north as with another going south. Morning departure time would be adjusted based on the number of scheduled stops. One should also reserve 24 hours in advance.
However, the proposed service would be set up progressively, from the minimum and depending on the interest generated from the customer. The municipality will not engage in the project without such a justification. 5. Administration
- There was adoption of a by-law determining the tax rates for fiscal year 2013. (You should find the numbers revealed in the future minutes.)
Recycling bins will cost $ 100 for new homes. Checks with no fund, $ 40. 6. Public safety
- The Mayor thanked the firefighters for their help during the recent storm. (Houses were deprived of electricity for several days, but our president, Dave Clark, could cook his turkey on its barbecue...)
8. Environment
- Ms. Raphaëlle Robitaille is named Director of the environment. The Mayor also pointed out that Ms. Robitaille has brilliantly gone through her previous duties as head of the Environmental health.
9. Planning and zoning
- A proposal to amend the existing regulations stipulated that no housing could be built on a slope of 30 ° or more, unless is found upon a "plateau" (less inclined area) of a minimum of 800 m2. Another prohibited the construction of a dock where the border of a property on the shore of the lake is less than 50 feet. Councillor Réjean Gosselin got in an exchange and in arguments on these projects and others that prompted the Mayor to defer the adoption of the entire amended regulation.
- The Council was in the process of recruiting missing members to the Planning Advisory Committee.
Question period
- Mr. Yves Léveillé asked at what stage was the project of installation of information kiosks (on which can be displayed notices or other).
Note: Only the minutes which will be issued by the municipality may formally account for the discussion at this session.
http://www.wentworth-nord.ca/index.php/conseilmunicipal/reunionsconseil/procesverbauxconseil
By Carl Chapdelaine | | up | |
| SÉANCE ORDINAIRE DU 14 JANVIER 2013 ORDRE DU JOUR
1. ADOPTION DE L'ORDRE DU JOUR
2. SUIVI ET ADOPTION DU PROCÈS-VERBAL DE LA SÉANCE ORDINAIRE DU 10 DÉCEMBRE ET DES DEUX SÉANCES EXTRAORDINAIRES DU 17 DÉCEMBRE 2012.
3. CORRESPONDANCE 4. LÉGISLATION 4.1 Rapports du maire et des présidents de comités; 4.2 Dépôt des déclarations annuelles des intérêts pécuniaires des membres du Conseil municipal;
5. ADMINISTRATION
5.1 Acceptation des rapports des salaires, des achats, des déboursés et des achats d'immobilisation du mois de décembre 2012; 5.2 Adoption du règlement 2013-382 déterminant les taux de taxes et compensations pour les services municipaux de l'exercice financier de l'année 2013; 5.3 Radiation des taxes municipales; 5.4 Approbation de l'état des personnes endettées envers la Municipalité (vente des immeubles pour non- paiement de taxes); 5.5 Autorisation de paiement des dépenses incompressibles pour l'année 2013; 5.6 Avis de motion - Règlement 2013-159-4 modifiant le règlement 2011-159-3 concernant les animaux; 5.7 Société Raynald Mercille - Renouvellement de mandat; 5.8 Avis de motion - Règlement SQ02-20 13-363-1 modifiant le règlement SQ02-2012-363 sur les systèmes d'alarme; 5.9 Avis de motion - Règlement SQ05-2013-340-1 modifiant le règlement SQ05-2012-340 concernant la propreté, la sécurité, la paix et l'ordre dans les voies publiques, les trottoirs, les parcs et places publiques; 5.10 Avis de motion - Règlement SQ04-2013-339-1 modifiant le règlement SQ04-2012-339 sur les nuisances;
6. SÉCURITÉ PUBLIQUE 6.1 Dépôt des rapports d'activités des périodes de paye # 2012-025 et # 2012-26; 6.2 Dépôt du rapport mensuel du Service de la sécurité incendie;
7. TRANSPORT 7.1 Dépôt du rapport mensuel d'activités du Service des travaux publics;
8. HYGIÈNE DU MILIEU ET ENVIRONNEMENT 8.1 Dépôt du rapport mensuel du Service de l'environnement; 8.2 Nomination d'une directrice
9. URBANISME ET ZONAGE 9.1 Dépôt du rapport mensuel du Service de l'urbanisme; 9.2 Dépôt de la liste des permis émis au cours du mois de décembre 2012; 9.3 Compte rendu de la réunion spéciale du Comité consultatif d'urbanisme du 14 décembre 2012; 9.4 Demande de dérogation mineure # 2012-00407; 9.5 Adoption du règlement no. 2012-271-4-4 modifiant les dispositions diverses du règlement de zonage no 2010-271 et ses amendements; 9.6 Embauche d'un directeur; 9.7 Représentants au Comité Consultatif d'Urbanisme
10. LOISIRS & CULTURE 10.1 Dépôt du rapport mensuel du Service de la vie communautaire, des loisirs et de la culture;
11. PROJETS SPÉCIAUX
12. VARIA
13. PÉRIODE DE QUESTIONS
Note : La conversion du document a fait sauter des accents. / Some accents are lost in the new format of the document. |
|
|  Report on session of the municipal Council of Oct. 9th 2012 |
(Less than ten persons were assisting.) 5. Administration 5.1. … $301 of purchase on tools needed for the interpretation path around Lake St. Francois-Xavier. … 5.3. Mr. Perrier offers to give the Chemin de Lisbourg to the municipality. The latter would then take charge of its maintenance. The road has to be conformed to certain norms for that to be accomplished. Some items have still to be presented by Mr. Perrier to authorize such a takeover ($1 million/km minimum, width, etc.). 8. Environment 8.2. $1000 to Abrinord (Agence de bassin versant de la Rivière du Nord), the river basin organisation, in accordance with the ongoing participation at the sampling station (near St. Michel) on la Rivière de l’Ouest, an affluent of the Rivière-du-Nord crossing the municipality. http://www.abrinord.qc.ca/Ententes_bassin/avenant36.pdf http://www.abrinord.qc.ca/Ententes_bassin/complet32.pdf . 11. Special projects Lake St. Francois-Xavier: A contract is signed with Laurentides Experts Conseils http://www.laurexco.ca/ to study the project of access roads and connected septic installations at the lake. The municipality cannot realize the project with its own resources. One way will start from Lac-à-la-Croix area, one from Lake Thurson area, other short ones on the other side of the lake. Collectives septic installations will probably proposed where it is impossible to have individual ones because the land doesn’t suit the project on those properties, adds Mayor Genest. When time comes, costs will be charged to concerned owners. If I got it well, they would also be implied in looking at a project of road by-passing the actual shared way of the Aerobic corridor. 12 Varia
- Viking canoe-kayak club (http://www.canoekayakviking.ca/) : The municipality wants to presents official congratulations to the Montfort’s club (for having won, for the fifth year on ten, `”the 2012 Canadian Masters Sprint Championship” at the national match in Dartmouth, N.S. last August 26th. They well practice for those at Lake St. Francois-Xavier where they will bring back their trophies). http://www.journalacces.ca/Actualite/2012-09-11/article-3073109/Le-Club-de-canoe-kayak-Viking%2C-champion-national-de-nouveau%21/1 (in French).
- Taxibus: This service is given only on demand; however, there is never any demand. The actual route starts at Lake-des-Seize-Îles (north of the Lake) and makes a stop in Montfort before eventually reaching St. Sauveur. The mayor has received a message from someone who suggest that the route should rather start at south of that lake and deserve Laurel before reaching Montfort.
Question period A resident ask about the snow removal contracts for a road from Laurel to St. Michel somehow. She learns that the usual contractor has not seen is contract renewed this year. ”Then, he should get rid of his sand and salt reserve that pollutes”, she says... Another one complaints that she has been bite by a dog and that nothing is done so it is ready to bite its next victim. The mayor answers that they are looking at giving longer teeth … to the bylaw but that they have first to look at jurisprudence with the MRC. Minutes of the session will later be available on the Municipality website; the latest one available is for August 13, 2012: http://www.wentworth-nord.ca/index.php/conseilmunicipal/reunionsconseil/procesverbauxconseil/proces-verbaux-2012 (in French). Carl Chapdelaine; October, 10, 2012 | | up | |
|  Meeting of the Lake Associations | Meeting of Wentworth-Nord lakes associations and the CRE-Laurentides on the environment, organized by the municipality. Montfort Pavilion, August 17th, 2012 (Preliminary report to our members) The municipality and its role in the field of the protection of the environment and of water in particular (Ms. Raphaëlle Robitaille, Joël Badertschetic Septic installations and shoreline inspection program The municipality will proceed with the inspection of septic installations of the residences within 300 metres from the banks of a lake and not yet classified into A, B+, B- or C. Cesspit installations are now non-compliant and classified as B-. At Lake Saint-François-Xavier, some properties have been forgotten in the PAPA operation. Others saw their owner contest the results and will be inspected again. In all, 17 inspections are planned at our Lake for 2012. A handful of other lakes in the municipality should also be subject to inspections through this operation this year and the rest of the Lakes will follow over the next ones. At the ambitious rate of 250 per year, a total of approximately 2500 inspections will be done. Notices will be sent to the owners of non-compliant facilities. If the owner does not conform, the municipality will take in charge the upgrading work, starting with the soil analysis. In the case of properties not accessible by road, access alternatives will have to be applied: use of a barge, access on the ice, etc. Note: The regulation on the disposal and treatment of waste water from isolated homes, the Q-2, r.8 has just been replaced by the Q-2, r.22 (of very complicated reading...), for regulations numbering reasons. We know that new regulations govern the shoreline protection. Here again, the properties will be visited and an official note hooked on the door mentioning corrections to be made if applicable. The owner will then have to conform or be imposed the prescribed and eventually recurrent penalty.
- New regulations (docks, wetlands, erosion)
a) Docks and boat shelters If a dock is to cover more than 20 m2 on a waterway, the owner will now need to obtain two permits, one from the provincial, governing the protection of the banks, and the other from the municipality. Also, a dock cannot, unless waiver, cover more than a certain surface on a waterway. b) Wetlands and erosion In Wentworth-North, a pond or similar formation, of more than 500 m2, cannot be modified. Any work of consequence involving moving the ground is subject to prior procurement of a permit. Dave Clark suggests that the municipality produces a kit of essentials regulations to comply with. Ms. R. Robitaille favourably received his request. Cyanobacteria When someone sees any, he should notify the municipality or his lake association. The latters could also be privileged intermediaries between the residents and the municipality, in this area as in many others relating to the lakes environment.
Issues of navigation on the Lakes (Ms. Melissa Laniel CRE-Laurentides)
- Approach and regulation process.
Ms. Laniel explains what steps must be undertaken with the Office of Boating Safety (OBS) in trying to get legislation from Transport Canada governing, for example, the use of motorized boats. She wants to pass on to our associations of lake the experience of the municipality of Nominingue, with the support of CRE-Laurentides, in the case of its lakes Sainte-Marie and Saint-Joseph. From the start, these steps face pitfalls and are, from the outset, discouraged by the Department. But this municipality previously had first come up with a code of ethics, as also had the municipality of Tremblant. This first approach also seems to be a kind of prerequisite to application of regulation, considered ultimate appeal by Transport Canada since a rationalization of its interventions in 2008. http://www.municipalitenominingue.qc.ca/pdf/Presentation29042012.pdf (French) http://www.municipalitenominingue.qc.ca/fr/nouvelles/pdf/Code_ethique_final.pdf (French) http://www.associationtremblant.ca/MissionF.htm (French) http://www.villedemont-tremblant.qc.ca/upload/File/Communiques%20de%20presse/2012-05-15-Enseignes%20-%20codes%20environnementaux%20et%20de%20courtoisie%20nautiqueSI.pdf (French) http://www.villedemont-tremblant.qc.ca/upload/File/Politique%20acces%20EAU/6-Politique_EAU_PAGE_50_67.pdf (French) ENVIRONMENTAL AND NAUTICAL COURTESY CODES ON THE VILLE’S LAKES http://www.villedemont-tremblant.qc.ca/upload/File/Info%20Mont-Tremblant/2012-05-29-Bulletin%20Municipal-VFJUIN2012-VSI.pdf André Soucy explains the approach taken by the Lake St. François-Xavier Association, while Dave Clark, its current president, underscores the difficulty of enforcing a regulation. Mr. Léon-Marie Hachez, President of the Association of Lake Grothé, mentioned to us that they have produced a pamphlet entitled: "Le lac Grothé : un joyau à protéger". Comments follow inviting associations to take advantage of one another approaches, tools, etc.
Volunteer Lake-Monitoring Program (VLMP) (RSVL) (CRE Laurentides)
- Partnership VLMP (RSVL) and Bleu Laurentides - Current state and perspective for the future
Ms. Laniel gives the MDDEP’s VLMP program details, including on analysis of samples for the presence of phosphorus (total phosp. traces : PTtra), not normally present naturally but introduced by man, rate of chlorophyll a (Chla) for the detection of microscopic algae and dissolved organic carbon (COD).
- Tools - Lakes kit, périphyton protocol, ...
Bleu Laurentides has produced a Lakes kit in which it describes the tools given to the lakes associations for the observation of the health of their lake (i.e. for the practice of limnology...) There are easy understandable cards on the concepts of Limnology, such eutrophication. It also presents eight protocols: some, particularly for the assessment of the transparency of the water, have just been translated in English. The presence of periphyton is a faster indicator than those currently used by the VLMP to note changes in health and aging of a lake. Training on its use will be given again in 2013. With some easily-available tools this protocol can be used at no cost. The results of the samplings and analyses obtained through different protocols should allow completing a health record booklet of the Lake. That booklet "facilitates screening of the changes or trends in the state of the lakes and ensures the transfer of that knowledge over the years"1. On top of that, there is the additional following, actually composed of a sampling (temperature, PH, dissolved oxygen and specific conductivity) made at the deepest point of the lake with the multisonde and of a bathymetric map. In 2010, we got that map for each of the two sections of our lake from Dr. Carignan; however, we didn’t yet get the multisonde experienced with Bleu Laurentides. Dave Clark asks if our association can get help to validate the choice of its tools of analysis of the quality of water and in the synthesis of the accumulated historical data. Mr. Joël Badertscher suggests associations get together in such a request to the municipality for justifying the granting of a budget. The CRE would provide expertise if a request was later made by the municipality and accepted. Ms. Laniel would eventually oversee the work. Mr. Pierre Bourbonnais, of the Association of owners of Lake St-Victor, will prepare such a request which will be communicated to the other associations prior to be proposed to the municipality. As regards the assessment of the presence of coliforms, the CRE will develop a protocol available for interested parties. A protocol for characterization of shoreline areas is also available. It would enable the associations to make their own assessment, by areas of a lake, next to that undertaken by the municipality, and to make it public unlike the latter. Protocol for the makeup and use of a rake to pick up aquatic plants and determine abundance. Compared presentation of aeration, etc., in a shallow lake and in a deep lake. Presentation of the VLMP results for our participating associations. The municipality could serve as a catalyst for the revival and organization of a grouping of our lake associations. The lake associations present thanked the municipality and the CRE for the meeting and wished it be repeated. Mr. Badertscher informs us that the power point presentation which ended will be available. Ms. Laniel had also offered to send us hers. Note: summary and partial report, pending additions by Colleen Horan, Dave Clark and others, as well as the availability of the power point presentations. 1. La surveillance volontaire des lacs et le programme Bleu Laurentides, par Mélissa Laniel, biologiste et chargée de projet Bleu Laurentides-CRE Laurentides, Wentworth-Nord, Le 17 août 2012 Carl Chapdelaine, Aug. - Sept. 2012. Original English version revised by Raymond Noël | | up | |
|  Report on the Municipal Council meeting of June 11th, 2012 | Laurel Mayor Genest presided the meeting. I will jump to item 9. Planning and zoning; there is always something interesting at this item, including the derogations requested by citizens to the municipal by-laws in this area. Just to tell you that it is fun to hear the list of "considering that" submitted by the Advisory Committee for planning (Comité consultatif d’urbanisme, CCU), to recommend a derogation from the by-law, in itself often quite understandable in any event. In item 5. Administration, point 3 was on the effective ratification of the collective agreement with unionized employees of the municipality. In item 6. Public Security, point 5 was on the hiring of a firefighter for the sector of Montfort. He is Mr. Nantel from Morin-Heights. I believe that it is shared work between the two municipalities. At question period, it was asked what was done concerning the request of the Ministry of transportation on the vocation of Rue du Chemin de fer or the shared part of the Aerobic corridor. It was replied that, for the moment, the talks continued with the provincial authorities. Another question concerned the state of municipal regulations regarding fireworks (the example was the case of cottages for rent on the edge of a small lake very echo...) The Mayor recalled the need to obtain a permit for any fireworks. One could report to the municipality on any nuisance, but that it was better, in this case, to first contact the owner of the land on which took place the fires. Note: This report is as simple indications, pending the publication of the minutes by the municipality… Carl | | up | |
|  Aerobic Corridor, Ecological trail and Access roads | Report on May 16, 2012, meeting on Corridor aerobic, in Montfort Those present: Mayor Genest, Councillors A. Soucy and A. Payette, Y.-A. Lord (Assistant dir.), J. Badertscher (urb. and envir.), Y Jegou (CCU), R. Ponce (SOPRÉ) and the undersigned for the ALSFX. Mr. Badertscher wanted to talk about municipal projects around Lake St. François-Xavier: 1. Access road for septic installations. 2. Project of the ecological trail on municipal property. The invitation stated that the municipality wants citizens of the Lake be best informed and talks be on the agenda to ensure that we act collaboratively between the municipality and concerned citizens. The Mayor added: 3. Request of the Ministry of transport of Quebec, concerning motor traffic on the Aerobic Corridor. He started by regretting the alarming tone of my note to our members on the letter of the Ministry of transportation. Then, he explained that the signatory of the latter had probably poorly gauged the impact and the practicability of its applications. The municipality expects new meetings with the Department to well expose the reality on the ground in the essential automobile use of the Aerobic Corridor by the residents living there. As imagined by some, the municipality will propose alternative options to the Department, most likely to create a new recreational way to bypass the currently shared section. Here, the project already on the agenda of this meeting, the one of the ecological trail, comes up at the right time. Obviously, the low elevation of the former CN track can’t come up in such projects, and users will have to oil their muscles or continue to use the actual way. Starting from Newaygo, probably at the outset of the current Mount Street, this trail would go around the other side of this section of the Lake, to connect to the Aerobic Corridor beyond the km 12 and beyond the last dwelling. This trail, about six km long, would most be on municipal land. The project was already well advanced in Mr. Badertscher’s files, if I judge on the document he gave me copy. Valuable grants expected, like the one from the Hydro Quebec’s Foundation for the environment, of over $ 80,000, would allow its implementation at a cost estimated at $171 000. It was not inconceivable in the mind of Mr. Mayor, in response to my question, that a trail going around the same section of the aerobic Corridor be considered above the current route; that wouldn’t add kilometers for the bikers or others. But, it was no longer on municipal land and everything remained to be done on such an option. It could also allow to consider that the current way become definitively a street, which could even connect a path for a few cottages across the Bay and for which no other access cannot currently be considered, because of a rugged topography. Other options would be devised for the section of Rue du Chemin de Fer between Montfort and Newaygo. But more specific proposals will be presented to the public and the Department on this subject in an imperative short coming future. This should not prevent any one of you to go for his suggestions. Security issues did not appear to all resolved so far, bikers sometime being a threat to walkers. And, for now, the request of the Ministry of transport remains and is not going in the direction proposed here. But let us get back to item 1; the project of the access roads required in sectors that are lacking, for the purposes of complying with regulations regarding the septic installations, was also updated, as provided for in this meeting agenda. Mr. Badertscher ensured us that pollution caused by existing facilities was very important, but I would have preferred a true demonstration. For properties near Lake Thurson, the action was imminent; a private road already available would enable such way to connect. However, I had to question the fact that the solely residents affected will have to pay for that road. They will also have to choose between a way that may, curiously, not allow car traffic but only the passage of machinery necessary for digging and emptying of septic tanks as required and a road built to municipal standards. Multiple modalities remain to settle for this achievement and for one or other of its versions: specific location, requirements, etc. As I mentioned above, it is not possible to build a road to serve the last end of the western sector, boarding the Bay, and other solutions will be looked for in this case. I will stay landlocked as my neighbours. To my question concerning the consultation of the two ad hoc committees already formed on the question of access roads, and for one of which I am a signatory, Mr. Badertscher answered to have never heard of before. The meeting was an opportunity to reveal a set of five large maps covering the Lake and which are the product of the sequence of aerial photos taken last fall and treated with powerful software. The main projects of ways, trails and park mention above are reported, municipal lands identified, etc., and more can be added in a short future. But this was too much information in a too short time to go in a thorough examination, considering also that the properties were not yet localised on the map, if I make no mistake. Reminding to Mr. Badertscher the interest of members of our executive for such maps, he told me that neither the municipality nor the MRC had actually the facilities to reproduce them but that they would be for consultation on appointment at the municipality. He had already promised me for soon maps with even more information included and on which he is working. The document he gave me also contains small maps sketching the various roads and trails existing or proposed, on the same background of photographic map, Google type. Maps from the same series, in an 11” X 17” format and the document as well were available at the Green Day in Laurel. Note: I can only give you what comes back to my mind and I am surely forgetting a lot. | | up | |
|  Report on the Municipal Council meeting of May 14th, 2012 | (Held at St. Michel de Wentworth) The major points of the meeting specifically concerned our sector. 1. Firstly, the Director General, Mrs. Sophie Bélanger communicated that grants for a recreational infrastructure in Montfort/Newaygo had been asked for. I understood it was in relation with the recreational trail proposed to cross the southwestern side of the sector Newaygo of the Lake, primarily on municipal land, orphaned lots or traded by their owner in place of the 7% of royalties of rights of construction on other lands. 2. Then was delivered the substance of a letter from the Ministère des Transport du Québec, Direction des Laurentides-Lanaudière, addressed to the Mayor and of which I already had copy. The purpose of the letter was the derogation allowing motor traffic on part of the aerobic Corridor, kms 9 to 12. It was said that the MRC had exceeded its powers in allowing such traffic. This state of fact undermined the safety of recreational activities to which it was intended and should be rectified in the next five years. By October 15, 2012, the municipality was required to provide a plan to comply with the request. In the meantime, it recommended refusing any request for construction or else permit to owners who access their land by this infrastructure. To the question of Mr. Yves Léveillé on this directive that he described as major and inconceivable, the municipal administration has shown itself dismayed by the case and said have already met with the Regional Directorate of the Department in this regard, without great results. A preliminary meeting with some representatives of the community, already set up by Mr. Joël Badertscher, Director of town planning and the environment for the municipality, on Wednesday May 16, on recreational and environmental issues, would see its agenda accidently complemented by this new folder. The Mayor should join the municipal councillor, A. Soucy, Mr. Jegou (Committee on urbanism) and Mr. Roger Ponce (SOPRE ), among others, and the undersigned, as a representative of our association. The future Quebec Coalition candidate in the by-election scheduled here in Ar genteuil, for June 11th, Mr. André Laframboise, present at the session, suggested that the question be of the current political issue. Note: Only minutes given by the municipality can be considered as official and this is not the purpose of this report. Carl | | up | |
|  Report on the Municipal Council meeting of April 10th, 2012 | Around thirty citizens attended the session of the municipal Council in Montfort. I had never seen so many. If several were interested in presentations of elected officials, others wait more for the period of questions; it was perhaps the case of the union of the municipality’s employees who came to the news concerning the renewal of their collective agreement. On the "Report of the Mayor", I will keep three points (I must confess that, for a non-initiated in these meetings or a little hard of hearing like me, and even in French, it is not easy to follow and note everything that is said): The review of the policy of the MRC on the conditions for use of the shared aerobic corridor strip of land of Chemin de fer, specially by neighbour residents whose properties do not strictly border this corridor. The subject is not new, not more than the vagueness prevailing about the rules which the residents should comply with. Fees are envisaged for certain services not considered until now. The administration of the municipality still works to get aid, from a government program, to allow residents to cope with the significant expenditures envisaged for implementing their septic facilities to standards, as of 1-2% borrowing rates. Finally, citizens will not see their mayor leaving town hall for the Assemblée nationale… Regarding the other points on the agenda, I will mention: The confirmation of Mr. Joël Badertscher to the position of Director of the environment and town planning, and of Mrs. Raphaëlle Robitaille at head of the Environmental health. An amount has been budgeted in relation to the aerial survey of Lake Saint-François-Xavier carried out last fall (and still on the table.) A maximum amount of $ 2,500 (?) has been budgeted by the MRC for the replacement of the Pavilion entrance doors, which seem to let cold go in as well. The municipality will participate to a maximum share of 40%. Miscellaneous: The municipality will begin to give fines for offences concerning the shore protection bylaws, as in the case of grass mowing (Min. $ 500 is shown on the sign which will be installed). Questions: A resident asked when septic regulation would be applied. It was not concerning those without road access, but the Mayor still recalled that they were counting on the aerial survey, the funding program, etc., and that 2013 would probably be the year of implementation. A representative of the unionized employees of the municipality asked when would be made the employer’s offer, as promised by the Mayor. The response was that this would be done soon. Concerning the fee of $ 20 now asked to the Association for the use of the Pavilion, Colleen Horan approached Councillor Soucy to learn that this was a jurisdiction of the MRC. The maintenance manager had demanded be remunerated for the burden of maintenance and supervision due to the various uses of the Pavilion, as it is elsewhere in the MRC. Note: The official proceedings of the sessions, for this year, have not yet appeared on the website of the municipality. My presentation of this report to our members is on an informal basis. Carl Chapdelaine | | up | |
|  Chemin de Montfort, short summary of meeting held on Feb 22 | Hi all:
The meeting began at 7: 00 pm and ended at 20: 20. Were present:
For St-Adolphe. The Mayor Réjean Gravel, DG Mr Christian Schryburt, the Deputy DG, engineering, Mr. Luc Brazeau and a dozen of their citizens of the Chemin de Montfort.
Wentworth-North; The DG Ms. Sophie Belanger, Councillor district # 5 André Soucy and 10 citizens of our municipality (M. André Genest represented the municipality at an another event).
St-Adolphe made a fairly correct audio-visual presentation of their section of the Chemin de Montfort. Their section is 2.4 KM and ours about 1.1 KM. There are 39 residents along their section and 132 vacant lots. There are 17 culverts on their section; 8 are to change. Their road measures 18 feet broad. It is too narrow and the ditchs are missing or filled with debris of all kinds. The vegetation begins to invade the road in some places. According to soil tests, the foundation of the road is in poor condition.
Here are the actions recommended in the short and medium term:
- Meeting in the shortest time with two mayors, two DGs, the road foremen and others to put on paper all these good intentions in order to plan a common intervention and a fair solution to pay for this repair. It would be good to finish it before the next municipal elections in November 2013. In short, here is what St-Adolphe offers:
(1) - In the next two weeks, they will install road signs to prohibit the movement of heavy truck transit on Montfort road. (2) - The speed will be lowered. (3) - 4 culverts in very poor state will be changed by June 2012. (4) - At critical places, ditchs will be dug or emptied in spring/summer 2012. (5) - Chemin de Montfort will be pruned this spring.
All our effort starts to give positive results. We must continue to pursue them in a respectful way; a little reminder from time to time to let them know that we always think about them (I will do it with pleasure at every opportunity). I will keep you informed at regular intervals of the progress of our project.
André Soucy Councillor district # 5 Carl’s «Bing» bang translation… | | |
|  |  Report on the Municipal Council meeting of January 9th, 2012 | Here presented is the agenda of the regular meeting of the Municipal Council of January 9th, 2012 in Montfort. (French only: we apologize) A few secondary points were added, as 7.2, which was a request to the Municipality of Saint-Adolphe d’Howard to adjust their proposal for the rehabilitation of Montfort Road on the Wentworth North project. The subject of the pitiful state of this road which is on both territories, came up again at question period. The whole meeting lasted about half an hour. I would like to report that Mr. Yves-Andre Lord, our municipality’s Deputy Executive Director listed some figures concerning the municipal tax and its’ allocations to various services. Rather than make any errors, I will not report on his comments.
The question period is often spirited. One citizen, outraged as others, regarding the sorry state of the Montfort Road at Lake Chevreuil spoke. He proposed adding pressure to the officials, and asked that Councillor Soucy take the helm of any future Committee dedicated to this action. The Councillor responded that pressure was already in progress with an impressive citizens’ petition, that meetings with the Mayor of Saint-Adolphe and others are on-going, and agreed that such a committee would bind together actions from everyone.
Discussions on our water analysis program took place between Andre Soucy, Councillor for District 5 and also between Sophie Belanger, Director General, and myself, as member of Association Lac St. Francois Xavier Health of our lake new committee.
Respectfully submitted,
Carl Chapdelaine | |
| ORDRE DU JOUR
1. ADOPTION DE L'ORDRE DU JOUR
2. SUIVI ET ADOPTION DU PROCÈS-VERBAL DE LA SÉANCE ORDINAIRE DU 12 DÉCEMBRE ET DES PROCÈS-VERBAUX DES DEUX SÉANCES EXTRAORDINAIRES DU 19 DÉCEMBRE 2011
3. CORRESPONDANCE
4. LÉGISLATION 4.1 Rapports du maire et des présidents de comités; 4.2 Avis de motion - Règlement 2012-361 décrétant les modalités de prise en charge des travaux de réfection sur la rue Gravel par la Municipalité; 4.3 Adoption du règlement 2012-354 déterminant le taux de taxes et les compensations des services municipaux pour l'exercice financier 2012; 4.4 Modification à la résolution # 2010-07-213 -Association du Lac Laurel; 5. ADMINISTRATION 5.1 Acceptation des rapports des salaires, des achats, des déboursés et des achats d'immobilisations du mois de décembre 2011; 5.2 Dépôt du vérificateur externe - Rapport financier 2010; 5.3 Approbation de l'état des personnes endettées envers la Municipalités (vente pour non-paiement des taxes); 5.4 Rapport d'embauche; 5.5 Renouvellement annuel du contrat d'assurances - Ultima Assurances et services financiers inc; 5.6 Renouvellement du contrat de contrôle et protection des petits animaux - Service de protection canine des Monts; , 5.7 Autorisation de paiement des dépenses incompressibles pour l'année 2012; 5,.8 Démission de Monsieur David. Whissell, député libéral d'Argenteuil; 6. SÉCURITÉ PUBLIQUE 6.1 Dépôt des rapports d'activités des périodes de paye # 2011-25 et # 2011-26 ; 6.2 Dépôt du rapport mensuel du Service de la sécurité incendie;
7. TRANSPORT 7.1 Déneigement saison 2011-2012 des stationnements de la caserne # 3, du 1900, chemin du Lac-Farmer et de l'église de Sr-Michel; 7.2.(Chemin de Montfort)
HYGIENE DU MILIEU ET ENVIRONNEMENT 8.1 Dépôt du rapport mensuel du Service de l'environnement;
9. URBANISME ET ZONAGE 9.1 Dépôt du rapport mensuel du Service de l'urbanisme; 9.2 Dépôt de la liste des permis émis et des permis révoqués au cours du mois de décembre 2011; 9.3 Compte rendu de la réunion du comité consultatif d'urbanisme du 15 décembre 20 Il; 9.4 Opération cadastrale; 9.5 Dérogations mineures;
10. LOISIRS & CULTURE 10.1 Ressources communautaires Sophie inc - Demande d'aide financière; 10.2 Embauche d'une responsable de la bibliothèque municipale;
11. PROJETS SPÉCIAUX 12. VARIA 13. PÉRIODE DE QUESTIONS 14. LEVÉE DE LA SÉANCE ORDINAIRE | | |
|
|  Report on the Municipal Council meeting of December, 12th 2011 | Note: Sorry for the approximate English version; your help is needed for translation. Good news for the eventual return of the ice ring on Lake Saint-François-Xavier. An application for funding for the operation and maintenance of this ice rink had been presented by Councillor André Soucy. It was adopted. However, a limit of $1000 is imposed on the participation of the municipality. All is conditional upon the presentation of appropriate invoices for these operations. Lake St. Louis ice ring is to benefit from a similar participation.
The municipality has an annual contract with the «Association du Lac Farmer»; it is for taking care of the beach if I make no mistake. What about us taking care of the buoys?
Wentworth-Nord is involved with Abrinord on an ongoing program of collecting samples of water throughout the Rivière-du-Nord basin. I was glad to hear that we were enough important and not too far from the actual river to be included in some of their work.
We heard from Mayor Genest that the municipality has been admitted in the «Les Fleurons du Québec» program <http://www.fleuronsduquebec.com/fleurons.htm>, formerly Villes, villages et campagnes fleuris. It got two jewels out of five. The goal of our administrators is to create a permanent motivation in the community regarding the improvement of the look of the municipality.
Green Day seems to be again at the agenda for 2012.
Our first question was not on any point in the agenda but rather on the birth of a portion of private road in the landscape of a southwestern sector of the Lake at Newaygo. However, we will have to come back on the matter at a future occasion, time given to properly situate all of this.
Mr Yves Léveillé asked if the municipality could assist in the realizaton of an eventual project of commemoration of the existence of the Orphanage of Montfort by the development of a square in the Val Lisbourg area for example.
The presentation of the update of the code of ethics of the municipality and to which its representatives are subject started the evening.
This first half hour was followed by a second, with the presentation of Mr. Joël Badertscher on the proposed amendment of the regulations on permits. The cutting of trees was among the issues. We hope that the regulations on permits enjoys a broader diffusion to residents. We would also like it be the same for the minutes of the sessions of the municipal Council.
At same place in Laurel on Monday, December 19 at 7:00pm, special session to adopt the 2012 budget. Carl | | |
|  Report on municipal council session of Oct. 11th, 2011, in Montfort
| October, 12th, 2011 Good evening (to members of the executive) The session lasted about two hours. As usual, there were less than ten residents in the assistance. A point of major interest for us was item 8: Public sanitation and the environment. Item 8.2: Service offer to obtain a digital cadastral map of Lac Saint-François-Xavier, was a resolution with effect in signing the contract to produce such a map by air photography. It was adopted and the contract would thus be granted as well as the operation carried out from this fall*. The mayor made the presentation. The production of such a map with, I imagine, coordinates obtained by means of satellite, is going to allow the overlapping of the land registry to actual state on the ground today. The obtained information is going to facilitate among others the access roads project which will serve the sector which is at present deprived of it (mine). Ways will correspond better to the data on the ground: location of cottages and spaces already planned for streets on the first land registries (and thus of municipal property), etc. The topographic constraints should also show up on the photographic map. (The digitalization will also allow this map, we can think, to integrate multiple available data from other sources.) (And Mayor Genest to develop on the issue of access roads and septic installations.) Some residents are ready to have their septic tank dug and be drained away when time comes, but do not see how getting there without these access roads. The operation can then go on. If necessary, the municipality will undertake itself the process of upgrading the installations in conformity with the by-law. At request of the residents and with obligations tied to it, these ways could even become municipal. The mayor would have already sought for subsidies from the government. A concerted action could also bring economies of scale in the realization of access roads and septic installations. It is not unthinkable that a branch of the access road of the South (............) gets towards the fire station. Yves Jegou will remind that the cadastral reform was not still applied to the lake. The mayor answers him that we cannot wait after that; that it is not even still in the field of the radar and thus certainly not before several years. Yves Jegou thinks that the residents should now hurry to mark out their land to be better able to locate it on the future map and that our association should quickly announce the event. Mr Yves-André Lord will specify that there will be already some landmarks on the map; the mayor will add that we will be able anyway to spot there our cottages, phone and hydro posts, etc. The costs of such an operation will be considered in the protocol of loan … (I understand that it is a question here of charging these costs to the concerned residents when time comes). It seems to me that this proposition and the presentation which made mayor Genest, let believe ...................................................(self censured).....................................................................my discharges of grey waters …
Another adopted proposition and which made me jump: the owner (...............) of the lands beyond mine and beyond those of my neighbours of the North of the sector, ..... becoming an immense "park". As the orphan lots which separate us from those are already imagined as remaining green and as beyond it are the public forest, there can hardly be new lots developped in the sector. It seems ..... that the multiplication of paths in such green spaces is of big charm for...................................................? It is necessary to remind that the municipality takes of right 7 % in money or in lands ......................................
There were also several other points of interest in the session. So, a regulation is going to prevent any new crossbar on the corridor aérobique, unless it passes above or under it. (An idea which Mister mayor had in mind for a long time and which would also apply to Parc linéaire. The status of these green ways would be similar to that of streams and they would thus become totally protected. The mayor would have received from the MRC the mandate of dealing with this issue.) There will be no Christmas mass in the Pavilion this year. To avoid the abuse and because they monopolize many resources, the expenses of presentation of a request of minor dispensation to the regulations of town planning go up from 200 to $400. The association of Lake Farmer is going to obtain a municipal subsidy for the installation of toilet for visitors. The municipality aims at supporting the lake associations which want to facilitate the frequentation of their waters by visitors. Thanks to the Pavilion and to its beach, our lake is already very welcoming …
Colleen can correct me if necessary and she will probably also present you notes on this municipal session.
*If you are in the habit of taking your outdoor bath or shower out of sight when the weather is ok, take it before eleven o'clock this fall, otherwise you risk to be added to personalities' gallery who were shot nudes for the campaign of Centraide …
..................... land to the municipality (in a special reserve of recreation land) in advance so that it can use those for its walking, snowshoeing and country skiing path project............... Carl C. | | |
|  Minutes of 2011 ALSFX Annual General Meeting
| (Note: Minutes to be presented for adoption at next AGM.) Late start due to Municipal meeting at 9 a.m. on septic systems
Present: There was a total of 55 people present who signed their names and some also gave e-mail addresses. The executive was also present. 1.Approval of Agenda Moved by Yves Jegou, seconded by Jean Patenaude and passed. 2.Adoption of the minutes of AGM July 24, 2010 Moved by Don Ducross, seconded by Grace Courey and passed
3.Opening Remarks ; President Dave Clark The lake is healthy and we should all participate in keeping it that way. There is more wildlife, fishing is great, and more non motorized activity on our lake. We commend the municipality on the shoreline restoration at the Pavilion. But nobody can sit back; we must remain vigilant, alert and be involved.
There are issues that need to be addressed a)Septic and grey water- we need to find solutions to this problem. However, the lake in all testing so far is clean and meets standards. b)Road access must be the decision of the people affected. Will new roads open up development of the lots in the back and how does the municipality want to deal with this? We need as much information as possible especially the costs involved. c)Orphan lands should remain green These 3 items must be kept separate and each dealt with individually.
- The boating by-laws are to be respected. The ongoing growth of motor
boats on our lake make it even more important.
- The level of the lake must be kept at its natural level and we must get a
better control. We need to plan with the municipality and residents for an action plan to ensure the lake level is maintained at levels acceptable to all residents.
- The executive sent a letter to the municipality offering that the association work with
them and form working teams with the residents and the executive so that we could help to provide solutions and by looking at all the options needed. We have an obligation to protect our lake and the environment. We need to get involved to a certain extent and the executive would like to play a role in its development by creating working teams for each of the 3 major issues before us.
4.Treasurer’s report; Edna Schell We had 75 members for the fiscal year ending June 30th 2011 for a total budget of $2625. Motion to accept treasurer’s financial report; moved b7 Joe Schell and seconded by Caron Czorny, carried. Motion to accept proposed budget for 2011-2012; moved by Grace Courey, seconded by Louis Saia , carried Fish restocking: 550 rainbow trout were placed in our lake in June 2011. Fishing prizes: The biggest fish (10.5 pounds) was caught by Jean Patenaude. He received a trophy and a tee-shirt. Honourable mentions; Felix Hausermann and Heather Ball Children’s section: 1st prize, Alistair Egan
To participate: Send your pictures, measurements and information to Edna Schell by August 15 at ednaschell@hotmail.com 5.Update on the class action suit; by Dave Clark At the beginning of the class action in 2004, approximately $12,000 was donated by association members in support of the class action against those responsible for the damage at Lake Thurston. This money has been held in escrow by the legal firm, Speigel and Sommer, who represent Dave Clark (and indirectly, the association) in his endeavour. The total liability for Dave is presently at $19,000. A court date is scheduled for early spring 2013 which will be spread over a 5 day period. An agency called Les Fonds, which is a government agency that provides financial aid, is aware that the application by Speigel and Sommer for a class action suit was accepted by the courts. This means that this government agency may reimburse any outstanding monies which were given in support. It is a “wait and see” situation.
6)Boating By-laws; by Dave Clark There are still some areas not respected, i.e. speeding in the narrows, taking off from shore, water skiing and other activities outside specific times, non compliance of the 10km per hour between the buoys and shore. These regulations are put there to protect the environment and the non motorized activities. The maximum of 40km per hour outside of ski hours is a Federal law. Dave Clark had a meeting in 2010 with the SQ concerning non-compliance. At the meeting he identified several non-compliant resident boats. Subsequently, the police visited some of the guilty parties. It seems that there has been some improvement, but compliance is not complete. The meeting with the SQ was very helpful in that they made the following important suggestions. They reassured us that we were not alone in our complaints about fast motorized boats. A) Do not pursue the problem alone but work as a community and become part of a neibourhood watch: recording and collecting data of individual non-compliant boats (color , pictures, boat license number) B) Do not talk to the individual. As a group we will be more effective, so we are asking people if they are willing to support the By-Law which we put in place, by recording what goes on in each area of the lake. If they are willing to do so, then we will be able to collect the required data and prepare a portfolio to present to the SQ. The buoys are Federal property and their placement must be respected. Transport Canada designated the position of these buoys at strategic places on the lake and they must not be moved. Reflectors are also on the buoys for safety reasons and if you have running lights or flash light you can see them at night. The two buoys which disappeared in 2010 must be replaced. We must work with the Municipality to repurchase these buoys and see to it that there is a Municipal budget for this. André Soucy, our Councillor, suggests that the Executive make a formal request to the municipality for these monies to be added to the Municipal budget before November 2011 for the replacement of the buoys. As for the installation and removal of the buoys, the Executive had been told by André Soucy, while he was President of our Association in the spring of 2010, that the Municipality would eventually take the responsibility of placing, removing and storing the buoys each year. However, since this was not included in the contract for the Municipal blue collar workers, we would have to take responsibility in the interim period. It now appears from comments by André Soucy that the Municipality wants the Lake Association to be implicated, or to take full responsibility for these tasks. Since this is a Federal By-Law, the Executive will have to clarify with the Municipality before the fall weather sets in. The issue of liability will have to be discussed.
The boat launch at Newaygo is only for the residents on the lake. This is the reason that there is a lock and chain .There is also a by-law that states no boats can enter a lake where there is no launch.
Comment from the Mayor Mayor André Genest thanked the people who helped with the planting at the Pavilion July 28, 2011. He also thanked Dave Clark for bringing disposable dry materials to the municipal dump rather than leave it at the garbage area for Newaygo.
7.Upcoming events; by Edna Schell 1) Dumpster dates, August 5 to August 11. This is for the use of only “no road access” residents since they do not have weekly garbage pick-up such as road-side residents, which includes the removal of large items such as stoves, fridges, furniture. Only 1 dumpster will be available and when it is full it will be taken away, regardless of the date. 2) The regatta will take place at the beach at 1p.m. today July 30, 2011. It is always the 4th Saturday in July and takes place at the beach in Montfort. Everyone is welcome. 3) We support the February skiathon. If interested contact Bob Clark at 226-9873 4) Church and Kayak annual Corn Roast. The Association would like to become involved in this event. We understand that this is partially a fund-raising event for the church and the Kayak Club. While we are interested in participating, we do not want, in any way, to detract from their fund -raising or to share in it. Our reason for wanting to participate is to help widen the community involvement and to be part of the event. The Kayak Club is having a corn roast August 20, and we urge people to attend. At present we have no specific role, but we hope to develop this in the future.
8.Nominations and executive membership Slate of Officers for June 30th, 2011 to July 1st,2012 To remain on the executive; President; Dave Clark Vice President; Raymond Noel Treasurer; Edna Schell Secretary; Colleen Horan Director; Carl Chapdelaine Director; Louis Quenneville Director; Adrian Hausermann One more director was needed to fill the 8th place. John Wilson volunteered. A motion was made to nominate John Wilson for director. It was so moved by Joe Schell, and seconded by Mrs. Ducross. All in favour. We welcome our newcomers.
9.New Business The Kayak Club has maintained a base in Montfort for many years. Their primary site is now in St. Adolphe de Howard where they will maintain a clubhouse. They will still be present at Lac St. François Xavier, where their training sessions will be held as usual, where children from various local camps will be accommodated in having the opportunity to train, and be on the water, and where the Clubs’ kayaks and dragon boat will be housed on the MRC property. They are an asset to the lake and all programs remain on our lake. They have an Olympic level coach, and are a growing organization which provides competitive and pleasurable training. If one joins, their boats can be used, social events enjoyed and the membership is $ 150 a year.
10. Comments and Questions; a)Should we get the press involved with the possible development of land around the lake? Collectively, can we form a powerful lobby committee? There was no substantive discussion or resolution to these questions b)Louise Bulmer stated that she felt it was unfair that the dumpster was provided for only the “no road” access residents. She felt that it was unfair that the road side residents might have to pay to have such items as shingles brought to the local dump, at a cost to them; which “no-road “ access residents would not have to pay. The response was that the dumpster from the Municipality had been negotiated to enable the “no-road “access residents to dispose of large items such as stoves, fridges, large furniture, which is a service that the roadside residents have each week with their regular pick-up. This discussion was unresolved. c)Are there any restrictions on the lake during the winter months for motorized vehicles? Mayor says we can’t prevent people on the lake and that there are no specific paths for motorized vehicles. d)Were there any “rights of way” on the mountains surrounding the lake for those who have “no-road” access? The Mayor responded that there are no acquired rights. He stated that the Municipality had recently purchased the “Orphan Lands”, but these lots do not comprise all of the lots on the mountains. Some land is privately owned. e)When Edna Schell mentioned that the legacy fund from Andrew Schell, which supports the Fish Fund would soon be depleted, Caron Czorny asked if money could be reallocated from the Communication budget by sending the Newsletter by e-mail or posting it on our LSFX site. Edna said that the problem with e-mail is that people change their e-mail addresses and do not notify us or forget to remove their filters and then cannot understand why the Newsletter did not get to them. As for posting the Newsletter on the LSFX site, there would be the problem of people receiving the Newsletter who are not members. Our membership is erratic with only 25 members joining in July, and the other 50 or so, straggling with their membership fees until June of the following year. If we provide the Newsletter free of charge, will there be any incentive for people to pay their membership? Edna said that this will be examined in the next year. f) More buoys; it was suggested that the Association make a formal request to the Municipality to place more buoys at the Newaygo end because of dangerous speeding and activities close to shore. There was no resolution to this suggestion. g)Strangers on the lake; What methods do we have to prevent visiting kayaks or boats on our lake? Dave says that there is a chain at Newaygo to prevent access but at other areas we try to make it difficult to enter the lake by putting up barriers (boulders, heavy rocks). Kayaks and canoes are more difficult to control as they are easier to launch. h)Airplane: Does the 40kph limit apply to the airplane on our lake? The 40 kph is for boaters only. By Federal law, airplanes such as the one on our lake are allowed to take off and land on the lake. i)Boat washing: Do the members of the Viking Club wash their boats? Dave answers that the law says boats must be washed. Can the association have a meeting with the Viking Club to mention that there is the possibility that boaters use the Viking Club name to launch their boats? j)Parking at the Pavilion: Mayor Genest asks that no one park in the roundabout at the entrance of the Pavilion but to use the designated parking areas. k)Diane Jegou is circulating a petition which asks the Quebec Government for better ambulance service in our area. l) André Soucy asked why an article which he had written for the fall Newsletter entitled the, “Saga of the Septic Systems,” had not been published. It was explained to André that the Executive of the Association had reviewed the article, and felt that some of the tone was harsh. Following a vote taken at the Executive meeting on November 27th, 2010, an e-mail was sent to André explaining its decision. No response was received from André Soucy. There was some discussion on the Executive’s right to accept or reject articles for the Newsletter. The position of the Executive has always been to publish a Newsletter which is a positive reflection of the Lake residents. The contents must be factual and not the personal reflection of any individual. Intimidation, name calling or inflammatory articles will not be accepted. m)Mayor Genest mentioned twice that he would like to have open discussions between the Municipality and the Executive. n)Joe Schell volunteered to be part of two working committees; one on septic systems and the other on road access.
Adjournment moved by Felix Hausermann Accepted by Dave Clark
Meeting adjourned at 12:30 p.m.